SI
SI
discoversearch

We've detected that you're using an ad content blocking browser plug-in or feature. Ads provide a critical source of revenue to the continued operation of Silicon Investor.  We ask that you disable ad blocking while on Silicon Investor in the best interests of our community.  If you are not using an ad blocker but are still receiving this message, make sure your browser's tracking protection is set to the 'standard' level.
Gold/Mining/Energy : Jersey Petroleum -JPI (was Jersey Goldfields -JRG)

 Public ReplyPrvt ReplyMark as Last ReadFilePrevious 10Next 10PreviousNext  
To: burner who wrote ()4/28/1998 2:41:00 PM
From: TomKing   of 100
 
News Release: JPI secures 10% interest on Saskatchewan wells

April 28, 1998

News Release: JPI.V

Jersey Petroleum Inc. has entered into an agreement with Hightowers Energy Inc. to drill two, dual-leg, horizontal production wells at Minton, Saskatchewan, on lands acquired from Raptor Capital Corporation. Jersey will fund a 10 (%) percent working interest in the wells.

The first re-entry well involves the drilling of two separate horizontal legs of approximately 400 metres each from a vertical Winnipegosis production well. The second re-entry well is an existing Red River horizontal well from which two new horizontal legs of approximately 400 metres in length will be drilled. Operations are to commence approximately May 7,1998.

The first Winnipegosis production well is anticipated to produce at an
initial rate of 500 BOPD or more and recover approximately 580,000 barrels. As this is a re-entry, the well is already flow-lined to the Raptor Minton battery.

On behalf of the Board,

James E. Yates
President
Report TOU ViolationShare This Post
 Public ReplyPrvt ReplyMark as Last ReadFilePrevious 10Next 10PreviousNext