Just for your information , this is in Bolivia as well and this is what a news release should look like ,only 4 weeks since the last one SAM -------------------------------------------------------------------
NEWS RELEASE TRANSMITTED BY CANADIAN CORPORATE NEWS
FOR: ORVANA MINERALS CORP.
TSE SYMBOL: ORV
MAY 20, 1998
Orvana Minerals: Don Mario Feasibility Study Update: Results of Down Plunge Core Drilling
VANCOUVER, BRITISH COLUMBIA--(ORV-T) Orvana Minerals Corp. reports assays for nine holes from the diamond drilling program being carried out as part of the feasibility study of the Don Mario gold- copper deposit in Eastern Bolivia. Drill holes DM 150 and DM 154 test the down plunge of the Lower Mineralized Zone (LMZ); DM 139 - 143 are from the Upper Mineralized Zone (UMZ); and DM 137 - 138 are from the LMZ "MiniPit".
Down Plunge Extension - Drill holes DM 150 and DM 106 (80 metres apart in elevation) have very similar intercepts, suggesting good down-plunge continuity of the LMZ. Approximately 30 metres of Lower Mineralized Unit (LMU) host rock were intercepted in DM 150, from 330 to 360 metres, with 5.4 metres (2.9 metres true thickness) averaging 16.8 g/t Au intersected within the lower portion of the LMU. Hole DM 150 is on Section 10190 N, approximately half way between holes DM 63 and DM 106 which are 150 metres apart and on the same section. Holes DM 63 and DM 106 (reported on December 12, 1996 News Release ) intersected 1.0 metre (0.7 metre true thickness) averaging 85.7 g/t Au and 4.5 metres (3.1 metre true thickness) averaging 16.4 g/t Au, respectively.
Drill hole DM 154 tests approximately 70 metres down-plunge from DM 150. DM 154 contains 1.2 metres (0.8 metre true thickness) at 10.3 g/t Au. The lower zone correlates with mineralization in DM 63. While the grade is lower in DM 154, the thickness of the zone is similar, demonstrating the persistence of the favourable stratigraphy down plunge. A follow-up drill hole is planned to intersect the LMZ 75 metres above DM 154 to allow this portion of the mineralization to be included in the mining reserve.
/T/
Lower Mineralized Zone - Down Plunge
Hole no. From To Length Grade Cut-off (m) (m) (m) Au (g/t)
DM 150 343.00 348.35 5.35 16.67 4 gram Au including 343.00 345.50 2.50 31.21 4 gram Au DM 154 413.38 414.40 1.02 4.95 4 gram Au and 416.50 417.70 1.20 10.32 4 gram Au
/T/
Upper Mineralized Zone - Drill results for the UMZ include holes DM 139 to DM 143. These results are also encouraging. Hole DM 141 includes 12.5 metres averaging 6.4 g/t Au, 2.3 percent Cu and 146 g/t Ag: DM 142 reports 84.75 metres averaging 1.5 g/t Au, 1.4 percent Cu, and 88.5 g/t Ag; DM 143 intersects 51.55 metres averaging 0.4 g/t Au, 1.6 percent Cu and 54 g/t Ag. A more complete assessment of the resource model, mining plan and additional metallurgical testing are required in order to enable the inclusion of the mineralization in the UMZ in the mining reserve.
/T/ Assay Results from Upper Mineralized Zone (Cut-off at 1 g/t Au, 0.5 percent Cu, 30 g/t Ag)
Hole no. From To Length Grade (m) (m) (m) Au Cu Ag (g/t) (p.cent) (g/t)
DM 139(x) 0.00 6.09 6.09 0.50 1.04 49.7 9.40 20.00 10.60 0.41 1.41 73.4 22.20 40.00 17.80 0.23 1.07 47.8 88.70 94.85 6.15 2.54 1.90 11.5 102.20 108.10 5.90 2.11 LMZ at 1 gram Au 105.00 106.20 1.20 5.89 LMZ at 4 gram Au
DM 140 0.00 11.00 11.00 0.39 2.17 14.1 21.75 23.00 1.25 0.91 5.68 786.0 28.90 50.80 21.90 0.88 2.43 157.5
DM 141 0.00 8.84 8.84 0.43 1.31 104.3 11.20 23.68 12.48 6.43 2.33 146.1 36.50 52.80 16.30 1.36 1.53 42.1
DM 142 0.00 84.75 84.75 1.46 1.41 88.5
DM 143 0.00 54.90 51.55(xx) 0.40 1.64 54.0
(x) Bottom two intervals are from the LMZ (xx) Note: 3.35m interval not sampled due to no core recovery
Lower Mineralized Zone - "Mini Pit"
Hole no. From To Length Grade Cut-off (m) (m) (m) Au (g/t)
DM 137 6.00 10.00 4.00 1.40 1 gram Au 15.30 18.40 3.10 1.18 1 gram Au 20.40 26.35 5.95 3.06 1 gram Au including 25.30 26.35 1.05 7.39 4 gram Au 32.00 35.00 3.00 1.47 1 gram Au
DM 138 5.65 6.65 1.00 4.66 1 and 4 gram Au 13.90 14.75 0.85 1.01 1 gram Au 37.85 46.55 8.70 7.00 1 gram Au including 41.85 42.85 1.00 16.28 4 gram Au 45.55 46.55 1.00 13.77 4 gram Au 48.55 56.50 7.95 9.43 1 gram Au including 53.40 56.50 3.10 21.82 4 gram Au
/T/
Status of Feasibility Study Drill Program - Feasibility core drilling is nearly complete. The final holes will be finished following a change of the drill rigs and the addition of a drill hole stabilizer to help control hole deviation of the deep drill holes. The total metres drilled to date for the feasibility have been greater than projected in order to fully delimit shallow mineralization as well as to follow down plunge, ore-grade mineralization. A summary of the 1998 Feasibility Study core drilling follows:
/T/
Drilled Holes Remaining Remaining to Drill Target Holes Metres with to Report Holes Metres Results
MiniPit 14 908 8 6 0 0 LMZ 23 4,422 17 6 3 985 UMZ 14 1,221 5 9 0 0
Total 51 6,551 30 21 3 985
/T/
Assay results for 30 of the 51 drill holes have been reported. Assays for drillholes DM 116 - 126 were reported on April 16, 1998, and assays for holes DM 127 - 136 were reported on May 4, 1998.
Don Mario Area Exploration - Exploration programs to be completed within the Second Quarter of 1998 include: trenching Don Mario North, trenching the southern extension of Don Mario Hill; and trenching of the Las Tojas and Zona B targets. The extension of ore grade values will be tested with trenches 25 metres apart, and mineralized zones will be extended with exploration trenches 50 or 100 metres apart, as conditions warrant.
Note: Diagram available from the Company at the phone number listed below.
-30-
FOR FURTHER INFORMATION PLEASE CONTACT:
Orvana Minerals Corp. D. Neil Hillhouse Chairman and CEO (604) 682-4929 or Orvana Minerals Corp. Nancy E. Woo Communications Manager (604) 682-4929 or Orvana Minerals Corp. Leigh W. Freeman President (303) 279-6027 orvana.com
INDUSTRY: PCS SUBJECT: DRM
-0- =================================================================== You may change your service options at anytime by visiting: cdn-news.com =================================================================== |