We've detected that you're using an ad content blocking browser plug-in or feature. Ads provide a critical source of revenue to the continued operation of Silicon Investor.  We ask that you disable ad blocking while on Silicon Investor in the best interests of our community.  If you are not using an ad blocker but are still receiving this message, make sure your browser's tracking protection is set to the 'standard' level.
Gold/Mining/Energy : Star Resources Corp. (SRR.TSE) (SRRCF.NASDAQBB)

 Public ReplyPrvt ReplyMark as Last ReadFilePrevious 10Next 10PreviousNext  
To: Mujibar Bickerstien who wrote (26)11/26/1996 7:25:00 PM
From: Paul Watkins   of 76
 
Here is the latest progress report from the Crater. A copy of the
site map showing trench locations will be available later today at
the Star Resources Web Site or directly via the URL:
pwatkins.com

Please note the next diamond recovery results are due on December
4th, 1996.

Crater of Diamonds State Park
Evaluation Program

Progress Report #12

Friday, November 22, 1996

Introduction
This progress report covers the project activity for the week ending
Friday, November 22, 1996.

Drilling Contract
Layne Christensen mobilized their equipment to the site on Tuesday
November 19 and began the set up on the first drill hole on Wednesday and Thursday. Due to the soft ground conditions the set up was slow. The first hole to be drilled is DH 96-1, a vertical hole located in the far southwest corner of the property. Drilling commenced on Friday.

Excavation / Transport
Set up activities for Trench #2 took place on Monday November 18. This trench was relocated from its original location in the southwest
wooded area of the site in order to achieve a broader representation
of the geologic units and to avoid environmental sensitive
disturbances whenever possible. The revised location was adjacent to the main Park access trail in the south central portion of the visitor
search area.

The Trench #2 excavation was completed on Wednesday morning in spite of two days of inclement weather. The compound was disassembled and backfilling completed by Thursday. The weather conditions and hauling activities had rutted the access roads so the Contractor mobilized additional equipment to repair the roads. The Contractor also ripped and plowed Trench sites #14 and #2 to the extent that the prevailing weather conditions would permit.

Trench #9 was laid out, scalped and the compound fencing erected by Friday November 22. No excavation will commence until all the access road repairs are completed.

Quantities

Trench #2

11/19/96 1,038,420 lb.
11/20/96 275,360 lb.
Total 1,313,780 lb. or 656.89 tons

Plant Operation
Ore Preparation Plant and DMS Plant continued the processing of the
second set of the Trench #14 material. The green material from Trench 14 (referred to as 14A) was processed the prior week and the
processing of the brown material (14B) was completed on November 17.

The summary processing data for Trench #14 is:

Trench #14A Trench #14B Total

Feed (tons) 314 328 642
Plant Hr. 43.0 42.0 85.0
Avg. Ton/Hr 7.3 7.81 7.55
Plant Availability 93.4% 90.0% 92.7
Tailings (tow) 56 92 148
% +1 mm 18% 29% 23%
Concentrate *(lb.) 85 lb. 90 lb. 175 lb.

The Ore Preparation Plant and DMS Plant started processing the Trench #2 material on Tuesday November 19 and completed the operation on Friday November 22.

The summary processing data for Trench #2 is:

Total

Feed (tons) 637
Plant Hr. 64.5
Avg. Ton/Hr l0.18
Plant Availability 90%
Tailings (tow) 50.74
% +1 mm 12.3%
Concentrate *(lb.) 1,360 lb.

Diamond Recovery
Representatives from Lakefield arrived on site on November 19 to
conduct the diamond recovery on the accumulated heavy media
concentrates.

The weight of the concentrate processed and the processing date is
indicated on the following Table:

Trench # Date Weight

14A 11/19/96 85
14B 11/20/96 90
13 11/21/96 320
8 11/22/96 270
2 11/23/96 1,360

For each separate set of DMS concentrate the following products were
collected from the diamond recovery operation:

* X-Ray Sortex Concentrate
* Grease Table (lmm - 2mm)
* Sortex Grease Table
* Grease Table - Attrition
* +12mm to -l6mm Fraction

All of the concentrates were placed in separate containers and
transferred to the locked cage in the Sort Room for future sorting.

Diamond Sorting
No diamond sorting was conducted during this reporting period.

For further information please contact:

Star Resources Corp.
Tel: (713) 870-9882 E-Mail: dedwards@compassnet.com