Hi Tim. Sorry, didn't mean to insinuate that if they accept a casual review of the work to date , then we should see it done in a few weeks,...
SEC wont accept a "casual review" it will have to be thorough, but assuming the grid is acceptable, the inclusion of the hillsides through mineshaft data is acceptable, the lack of drilling is acceptable, the calculations are acceptable, the security of the samples is acceptable, the QC of the asssayer is acceptable, the topographical info in the area is "obvious", the grab sample size is acceptable, the trench width and depth is acceptable, the gathered data is acceptable and used correctly............ then everything should be a go.
80% of the audit is "smell and sight" if things don't look good or smell right, then GE is in for a long winter! If everything is catalogued, contained, recorded, etc. etc. then they could be back at it in no time!!!
the Chief |