the release was coming as the stock started to get firm bids over the last couple of days - the news fairies must have known!
Dry Creek drill results Grayd Resource Corporation GYD Shares issued 13,392,942 Jul 29 close $0.91 Thu 30 Jul 98 News Release Mr. John McCluskey reports Grayd Resource has encountered a significant drill intersection on its 100 per cent owned Dry Creek property in Alaska. Hole DC98-60, drilled within the Fosters Creek zone, intersected disseminated, semi-massive and massive sulphides from 69.5 to 283.7 feet, for a total intercept length of 214.2 feet (65.3m). Based on geological projections and core axis angles, the intercept is estimated to represent a true width of mineralization of approximately 160 feet (48.8m). Previous high-grade assays from within the Fosters Creek zone were reported on June 15, 1998, and additional intercepts that still have assays pending were reported on July 21, 1998. Hole DC98-60 was drilled to intersect the zone below holes DC98-40 and 41. Hole DC98-40 intersected 0.2 per cent Cu, 2.6 per cent Pb, 6.2 per cent Zn, 183.0 g/t Ag and 1.03 g/t Au over a true width of 95.0 feet (29.0m). Hole DC98-41, drilled at a steeper angle from the same pad, did not intersect mineralization due to a fault which displaced the zone to the north. Hole DC98-60 is interpreted to have intersected the faulted offset projection of the mineralization intersected in hole DC98-40, approximately 300 feet (90m) down along the dip of the zone. Hole DC98-60 indicates that the zone has widened at depth and is open down dip. Latest assays for the intersections in the Fosters Creek zone and for intersections in the Lago Creek and Discovery areas should be returned over the next two weeks. (c) Copyright 1998 Canjex Publishing Ltd. canada-stockwatch.com
|