We've detected that you're using an ad content blocking browser plug-in or feature. Ads provide a critical source of revenue to the continued operation of Silicon Investor.  We ask that you disable ad blocking while on Silicon Investor in the best interests of our community.  If you are not using an ad blocker but are still receiving this message, make sure your browser's tracking protection is set to the 'standard' level.
Gold/Mining/Energy : Bearcat (BEA-C) & Stampede (STF-C)

 Public ReplyPrvt ReplyMark as Last ReadFilePrevious 10Next 10PreviousNext  
To: Jim P who wrote (1564)9/24/1998 12:09:00 AM
From: grayhairs  Read Replies (1) of 2306
 
Hi Jim,

I'd assume that they get a flare permit for 50 MMCF and I would assume that they will flow about 5 MMCF during completion "cleanup" operations leaving about 45 MMCF available to flare on the flow test.

If they do a 4 point test, they'll flow about 8 MMCF doing the 4 points and then if they drop the rate more than normal (so as to maximize reservoir data collection) to ~5 MMCF/D for the extended flow the total flow test (including shutins) would be about 8-1/2 days.

If they do only a single point test, it will last between 9 days (@5 MMCF/d) and 15 days (@3 MMCF/d). The lower the flow rate, the "further into the reservoir" they will actually look with the test, assuming that they flow the same total volume of gas.

Later,
grayhairs

P.S. -- The well will be scouted this weekend.