We've detected that you're using an ad content blocking browser plug-in or feature. Ads provide a critical source of revenue to the continued operation of Silicon Investor.  We ask that you disable ad blocking while on Silicon Investor in the best interests of our community.  If you are not using an ad blocker but are still receiving this message, make sure your browser's tracking protection is set to the 'standard' level.
Technology Stocks : Germany : elections, EuroDollar, Y2k

 Public ReplyPrvt ReplyMark as Last ReadFileNext 10PreviousNext  
To: John Mansfield who wrote ()9/25/1998 6:15:00 PM
From: John Mansfield  Read Replies (1) of 44
 
'Will EU Vendors be able to deliver on time?

asked in the Electric Utilities and Y2K Q&A Forum

Will EU equipment vendors be able to deliver in time for full deployment, implementation and testing?

All indications are that the power utilities are only now really getting rolling with their Y2K programs. For the
sake of argument let's assume they all finish their assessment by 1/1/1999. Whether the plant is a power
generating station, energy management system, HVDC bridge, or other they all discover that the problem
isn't that bad. They need to upgrade some PC BIOSs, replace some PCs, upgrade and remediate some
mainframe software, replace a few PLCs, upgrade some industry specific black boxes and replace some
industry specific black boxes.

My question is this, when 7800+ plants place their modest POs for a few pieces of equipment from ABB,
Honeywell, Bently-Nevada, Elsag-Bailey, et al., are these companies going to be able to deliver in a timely
fashion? Will each plant be able to deploy, implement and test the newly configured system in time?

A simple example scenario:

If each power plant needs to replace only one critical piece of equipment, and that piece of equipment is
only available from a single vendor, say ABB or Bently-Nevada, can said vendor produce and deliver 7800
units of that piece of equipment in 6 months (from 1/1999 to 6/1999)?

I'm assumming that there is not a lot of inventory of these types of products. 7800 in 6 months is 1300 per
month or 60 units per work day. Are these companies set up for this level of production?

Curious minds need to know.

--AJ

Asked by Andrew J. Edgar (ajedgar@centigram.com) on September 24, 1998.

Answers

All the mission critical systems (Hardware and Software) are supplied by multiple vendors from all over the
world. Most of these systems require only a software patch for Y2k remediation and this will not be a
demand supply problem. You can try looking at the web pages of major equipment suppliers like ABB
Power Generation, Siemens Generation, Honeywell, Bently Nevada, General Electric, Elsag Bailey,
Cegelec, Westinghouse Electric. They all require only software patch

The NERC Y2k website has a 44 page inventory of equipment commonly used in utilities. This inventory
gives a good idea about the kind of mission critical systems that are used.

Answered by V Rajsekar (rajsekar@compuserve.com) on September 24, 1998.