SI
SI
discoversearch

We've detected that you're using an ad content blocking browser plug-in or feature. Ads provide a critical source of revenue to the continued operation of Silicon Investor.  We ask that you disable ad blocking while on Silicon Investor in the best interests of our community.  If you are not using an ad blocker but are still receiving this message, make sure your browser's tracking protection is set to the 'standard' level.
Gold/Mining/Energy : August thru November 10 baggers

 Public ReplyPrvt ReplyMark as Last ReadFilePrevious 10Next 10PreviousNext  
To: Bob Lawson who wrote (20)11/9/1998 11:01:00 AM
From: Bob Lawson  Read Replies (1) of 28
 
Good things happen to GOOD companies ....

ANOTHER GREAT RELEASE

VOLUME already 123 k

Naneco Minerals Ltd -

Jiawula drilling results

Naneco Minerals Ltd
NNE
Shares issued 17,668,496
1998-11-06 close $0.3
Monday Nov 9 1998
Mr. Archie Nesbitt reports
Drilling on the company's Jiawula silver-copper-lead-zinc deposit in Nei
Mongolia, China, continues to intersect extremely significant massive to
semi-massive sulphide mineralization on zone No. 2 in core holes J-98-13,
J-98-14, and J-98-15. High grade intercepts were encountered in each of these
holes. Zone No. 12 is only one of 40 mineralized zones that has been drilled
extensively to date.
Core hole J-98-13 intersected 3.95m (12.96 feet) grading, in the upper and lower
intervals, 136.8 g/t Ag, 0.23 per cent Cu, and 19.46 per cent combined Pb-Zn.
Core hole J-98-14 intersected 16.98m (55 feet) grading, in the upper and lower
intervals, 72.68 g/t Ag, 0.26 per cent Cu, and 6.49 per cent combined Pb-Zn
which contained a 1.6m (5.25 feet) interval grading 153.84 g/t Ag, 0.44 per cent
Cu, and 19.7 per cent combined Pb-Zn and a 2.44m (eight feet) interval grading
177.04 g/t Ag, 0.62 per cent Cu, and 10.2 per cent combined Pb-Zn.
Core hole J-98-15 intersected 7.35m (24.1 feet) grading 163.49 g/t Ag, 0.55 per
cent Cu, and 10.12 per cent combined Pb-Zn which contained a 2.78m (9.12
feet) interval grading 329.05 g/t Ag, 1.02 per cent Cu, and 15.5 per cent
combined Pb-Zn.
Final assays for several other core holes will be released as soon as additional
analytical procedures for particularly high grade intervals have been completed.

Depth of Silver Copper Lead Zinc
Intercept Values Values Values Values
(m) (g/t) (%) (%) (%)

Hole J-98-13

153.13-154.25 166.2 0.15 12.08 10.17
154.25-154.65 119.5 0.13 6.96 6.52
1.52 153.91 0.14 10.73 9.21

170.52-172.00 140.4 0.36 5.12 14.93
172.00-172.43 114.6 0.14 6.19 14.40
172.43-172.95 94.9 0.16 7.55 7.88
2.43 126.10 0.28 5.83 13.33
3.95 136.80 0.23 7.72 11.74

Hole J-98-14

204.92-206.04 171.9 0.51 4.73 16.83
206.04-206.52 111.7 0.27 0.89 14.45
1.60 153.84 0.44 3.58 16.12

206.52-207.70 22.6 0.02 0.28 0.89
233.20-234.05 66.2 0.15 1.04 8.41
234.05-234.85 40.6 0.13 0.12 1.40
234.85-236.08 188.6 0.86 0.38 9.43
236.08-236.91 127.8 0.44 0.38 11.06
236.91-237.29 247.2 0.23 1.6 7.16
2.44 177.04 0.62 0.57 9.63
237.29-238.26 4.2 0.04 0.03 0.61
238.26-239.02 89.9 0.42 0.41 13.83
239.02-240.90 3.2 0.03 0.02 0.67
240.90-242.00 8.4 0.005 0.3 1.18
242.00-243.70 49.5 0.17 0.57 4.40
243.70-244.28 141.9 0.28 0.65 9.18
244.28-245.20 11.7 0.06 0.19 0.78
245.20-246.60 67.6 0.36 0.39 3.79
246.60-247.40 101.4 0.62 0.24 9.76
16.98 72.68 0.26 0.67 5.82

Hole J-98-15

153.45-154.85 110.6 0.49 2.52 10.76
154.85-155.20 27.1 0.1 0.72 2.01
155.20-155.46 291.1 0.51 18.56 5.65
155.46-155.94 122.6 0.12 1.28 1.54
155.94-156.94 228.2 0.87 1.08 14.37
156.94-157.98 530.8 1.71 2.08 17.16
2.78 329.05 1.02 3.12 12.38
157.98-158.38 127.6 0.55 0.27 10.83
158.38-160.20 23.2 0.06 0.81 1.13
160.20-160.80 48.8 0.2 2.89 3.29
7.35 163.49 0.55 2.15 7.97

Results from Naneco's earlier drilling include the following:

Combined
Depth of Silver Copper Lead-Zinc
Intercept Values Values Values
(m) (g/t) (%) (%)

J-98-1
17.1 171.60 0.21 11.05

J-98-2
2.5 313.04 0.50 27.10

J-98-3
3.0 191.87 0.34 22.77

J-98-4
22.0 147.67 0.55 11.98

J-98-5
12.0 113.80 0.35 13.26

J-98-6
17.1 111.22 0.39 11.89

Naneco has completed a total of 30 confirmation and exploration core holes to
date on Jiawula No. 2 zone with sample cutting completed onsite and one-half
core samples being shipped to ITS in Vancouver for assaying. The remaining
one-half core is stored at the Jiawula mine site. Assays will be ported as available.
Drilling will continue through 1998, weather permitting, to explore further along the
trend of zone No. 2 and to expand on the known mining resource pending
completion of planned geophysical surveys.
Report TOU ViolationShare This Post
 Public ReplyPrvt ReplyMark as Last ReadFilePrevious 10Next 10PreviousNext