SI
SI
discoversearch

We've detected that you're using an ad content blocking browser plug-in or feature. Ads provide a critical source of revenue to the continued operation of Silicon Investor.  We ask that you disable ad blocking while on Silicon Investor in the best interests of our community.  If you are not using an ad blocker but are still receiving this message, make sure your browser's tracking protection is set to the 'standard' level.
Gold/Mining/Energy : Winspear Resources

 Public ReplyPrvt ReplyMark as Last ReadFilePrevious 10Next 10PreviousNext  
To: gg cox who wrote (9714)11/25/1998 8:08:00 PM
From: George J. Tromp  Read Replies (6) of 26850
 
Hello Threadsters FACTS which can be inferred or assumed
3.1Million tons
1.2 on land and into the lake
670000 tons land based. the rest into the lake.
301 carats per ton., diluted down in the scoping study.
based on 2 bulks 200 meters apart.
41 drill holes must prove continuity between and around the bulk
areas to extrapolate any meaningful consistency in diamond grade
to the 670,000 tons. Drilling holes in the lake must show previous
high macro/micro relationships to be meaningful.
22 drill holes last winter never reported. Comment: It is late and overdue IMHO.
Several deep holes with far reaching spacing and dip extention.

Teevees position 70-80million tons. Theory only.
My position: I will let the drills prove the tonnage., and IMHO., if they
dont produce some degree of consistency.,
I will be selling into the news.
REASON: The micro/macro relationships should be consistant on
the 41 drill holes., according to dykem theory., sprekden.katche.
Anything less is not meeting my expectations.
Large stones may or may not appear., but the micro/macro percentages should be consistent.
George J. Tromp
DCHRReport
Miner450@aol.com
Report TOU ViolationShare This Post
 Public ReplyPrvt ReplyMark as Last ReadFilePrevious 10Next 10PreviousNext