SI
SI
discoversearch

We've detected that you're using an ad content blocking browser plug-in or feature. Ads provide a critical source of revenue to the continued operation of Silicon Investor.  We ask that you disable ad blocking while on Silicon Investor in the best interests of our community.  If you are not using an ad blocker but are still receiving this message, make sure your browser's tracking protection is set to the 'standard' level.
Technology Stocks : Cymer (CYMI)

 Public ReplyPrvt ReplyMark as Last ReadFilePrevious 10Next 10PreviousNext  
To: Clarksterh who wrote (20386)12/10/1998 6:49:00 PM
From: FJB  Read Replies (1) of 25960
 
Clark,

RE:Significantly more than 50% of factory capacity is currently
at greater than 0.25u and doesn't use DUV. Additionally, this ignores the fact that as devices shrink further, more and more layers on each chip (even those already at less than 0.25u) will require DUV as some of the non-critical layers move from >0.25 to <0.25.


The world's largest DRAM company, Samsung, is estimated to have 25% of its capacity at the 0.25&#181m level. This is not taking into consideration layers at sub-0.25, for which the number will increase as we move 256Mb, 1Gb, etc.

Besides reducing debt, selling off operations can give Korean chip firms a cash infusion needed to modernize DRAM operations, said Dan Hutcheson, president of VLSI Research. "They've got to invest in state-of-the-art production capacity," he said, estimating that Samsung has converted only about 25 percent of its capacity to quarter-micron.
sumnet.com

The world's future largest DRAM manufacturer, Micron, after TI fab upgrades, will be converting newly inherited fabs to 0.18/0.15.

Then you have the Hyundai/LG combination.
Hyundai currently has four 8-inch fabs in Korea that are being upgraded to
sub-quarter-micron processing, and an 8-inch 0.22-micron fab in Eugene,
Ore. LG Semicon operates five 8-inch fabs in South Korea, and has started
converting some of them to sub-quarter micron processing.

Both companies have unfinished superfabs on hold in the U.K. Hyundai is
building one in Scotland and LG Semicon has one in Wales. It was unclear
whether construction on either of these plants would resume after the merger.

semibiznews.com

That's not including the other world's 20 largest semiconductor companies.

Bob
Report TOU ViolationShare This Post
 Public ReplyPrvt ReplyMark as Last ReadFilePrevious 10Next 10PreviousNext