We've detected that you're using an ad content blocking browser plug-in or feature. Ads provide a critical source of revenue to the continued operation of Silicon Investor.  We ask that you disable ad blocking while on Silicon Investor in the best interests of our community.  If you are not using an ad blocker but are still receiving this message, make sure your browser's tracking protection is set to the 'standard' level.
Gold/Mining/Energy : Global Platinum & Gold (GPGI)

 Public ReplyPrvt ReplyMark as Last ReadFilePrevious 10Next 10PreviousNext  
To: Ed Fishbaine who wrote (8813)12/14/1998 6:12:00 PM
From: Dennis DeNoble  Read Replies (2) of 14226
 
TO ALL:

Following is an update from Mike McKay.

HASSAYAMPA PROJECT UP-DATE

Production for the last two weeks was well below target. An employee inadvertently diverted 500 lbs. Of discharge sand into our water recalculating system rather than the waste disposal container provided by our disposal company. The sand plugged spray nozzles, pipes and pumps.

The colder than normal weather (25 degree F) caused pumps and some water links to freeze and increased the time it takes to dry precipitate. 50 tons of screened ore was processed during this period.

The water permitting process is proceeding well and indications to date are favorable.

FUTURE PLANS

Additional elective heaters are being installed to decrease the length of time it takes to dry the precipitate.

Pregnant liquor from the digestion of copper shot will be processed through resin columns starting December 16. For this application the small resin columns (used in the June control test) will be used. The resin will be assayed on December 21 with a planned shipping date of December 23rd to Sabin Metals Inc.

Assay of the resin at the Oro Grande confirms the pick up of gold and platinum.

Mike McKay