SI
SI
discoversearch

We've detected that you're using an ad content blocking browser plug-in or feature. Ads provide a critical source of revenue to the continued operation of Silicon Investor.  We ask that you disable ad blocking while on Silicon Investor in the best interests of our community.  If you are not using an ad blocker but are still receiving this message, make sure your browser's tracking protection is set to the 'standard' level.
Technology Stocks : Coyote Network Systems (CYOE), Mixing It Up, IP and ATM

 Public ReplyPrvt ReplyMark as Last ReadFilePrevious 10Next 10PreviousNext  
To: Frank A. Coluccio who wrote (97)12/21/1998 5:02:00 PM
From: NYBellBoy  Read Replies (1) of 360
 
Frank - What is meant by an engineering facility? That is my question? Do they have a building, equipment and people dedicated to it? or is the equipment co-located at an ILEC and in a cage. I don't think their engineers would be allowed to co-locate in a ILEC facility.

If the equipment is located at one of the ISP Condos, Zoozs ect., what is the break even in yearly MOUs required to offset the benefit of the engineering facility?

Where's the Big Profit margin to absorb all the overhead and everyone's profit along the way.

It doesn't add up for me.

Thanks & have a Great Holiday,

<]:)>

BellBoy

Report TOU ViolationShare This Post
 Public ReplyPrvt ReplyMark as Last ReadFilePrevious 10Next 10PreviousNext