SI
SI
discoversearch

We've detected that you're using an ad content blocking browser plug-in or feature. Ads provide a critical source of revenue to the continued operation of Silicon Investor.  We ask that you disable ad blocking while on Silicon Investor in the best interests of our community.  If you are not using an ad blocker but are still receiving this message, make sure your browser's tracking protection is set to the 'standard' level.
Gold/Mining/Energy : Millstream Mines (MLSM)

 Public ReplyPrvt ReplyMark as Last ReadFilePrevious 10Next 10PreviousNext  
To: Steve who wrote ()1/25/1999 11:15:00 AM
From: Wilse  Read Replies (1) of 664
 
NEWS: DRILLING POTTER!!!

Canadian Dealing Network Millstream Mines Ltd.
Symbol - MLSM 44 Victoria St. Suite2001 Toronto,
Ontario
Tel: (416) 368-9595
25,801,839 shares issued Fax: (416) 368-0584
FOR IMMEDIATE RELEASE Date: Jan. 25, 1999

NEWS RELEASE

MILLSTREAM COMMENCES TIMMINS AREA
DEEPER DRILL PROGRAM

Millstream Mines Ltd.'s Deeper Drill Program is starting up on its Cu-Zn-Co
VMS Potter Mine Property located in northern Ontario, Canada in the
Timmins-Matheson area. The Diamond Drill Contractor is mobilizing to
replace the current on-site drill (Longyear 38) with a more powerful drill
rig (Longyear 50) capable of doing 2,200+/- meter holes (7,000+/-ft.)
cutting NQ size core (same size as past drilling programs).

The current Deeper Drill Program is targeted to further expand and confirm
the downward continuity of the Discovered Massive Cu-Zn-Co Sulphide ore
zones for an additional 305 meters (1,000ft.) below what was confirmed in
the previous deep drill program. The objective being to confirm
approximately 610 meters (2,000ft.) of massive sulphide ore zones below the
past mine workings with parallel zones (stacking) that are open in depth.

The initial stage of this Deeper Drill Program is to drill four (4) holes,
1,300+/-meters (4,265+/-ft.) in length to intersect the Cu-Zn-Co massive
sulphide (MASA) ore zones 914+/- meters (3,000+/-ft.) below surface. Hole
S99-01 (17+60W, 875S, Az 350, Dip -60) is the first of the four holes to be
drilled. Successful results will require further drilling of infill holes
or wedging off existing holes for configuration of the ore zones. Later,
after compilation of the data, structuring of the next phases will be
undertaken for this immediate mine area of the property.

Exhibit 1. Deep Drilling Program Results - Highlights of Phase 1

From To Core Length Cu Zinc Co Silver Gross Value
Hole No. metres metres (M) (FT) (%T) (%T) (T%) (oz/T) (US$/ton) (C$/ton)


S97-08A 482.40 483.90 1.50 8.53 3.62 3.19 0.136 0.86 144.39 220.79
491.86 494.40 2.54 8.33 2.33 9.09 0.073 1.08 153.45 234.78
504.20 506.20 2.00 6.56 6.00 4.37 0.082 1.91 173.30 265.15
537.40 543.70 6.30 20.90 2.32 3.14 0.000 0.12 67.13 102.71

S97-09 604.60 627.50 22.90 75.13 2.65 2.70 0.080 0.76 101.49 155.28
including613.60 623.00 9.40 30.84 3.86 4.57 0.128 1.153 158.53 242.55

S98-01 695.15 702.90 7.75 25.40 5.34 3.24 0.067 1.16 143.02 218.82
including695.15 700.40 5.25 17.20 7.81 4.76 0.096 1.69 208.58 319.13
773.50 776.50 3.00 9.80 2.17 3.90 0.047 0.46 89.83 137.44
including774.35 776.50 2.15 7.10 2.95 5.42 0.053 0.61 118.52 181.34

S98-05 420.12 423.75 3.63 11.90 2.69 0.29 0.079 0.49 78.14 119.55
507.40 519.70 12.30 40.40 1.53 2.05 0.131 0.42 98.37 150.51
including513.00 519.70 6.70 22.00 2.14 2.47 0.174 0.58 130.08 199.02
515.00 519.70 4.70 15.40 2.54 3.38 0.168 0.70 142.33 217.76
516.00 519.70 3.70 12.10 2.75 3.74 0.165 0.73 147.61 225.84

S98-06 653.90 680.66 26.76 87.80 2.57 1.68 0.082 0.61 90.80 138.92
including653.96 665.50 11.60 38.06 4.34 2.18 0.122 0.94 140.03 214.25
656.90 663.49 9.59 31.46 5.01 2.63 0.131 1.09 158.57 242.61
696.62 705.30 8.68 28.48 3.39 0.80 0.071 0.67 90.67 138.73
including696.62 703.00 6.38 20.93 4.46 1.06 0.094 0.89 119.64 183.05


* Based on the following Metal Prices: US$0.744/lb Cu, US$0.454/lb Zn,
US$21.00/lb Co, US$4.70/oz Ag and US$ - $1.53 CDN

Millstream Mines Ltd. further wishes to announce that its web site has
moved to a new location, www.millstreammines.com.

The principle objective of Millstream Mines Ltd. is to enhance and develop
known mineral properties to production potential. Millstream holds mineral
claims or interests, directly or through wholly owned subsidiaries in
Canada, USA, and the Czech Republic.

-30-

For further information contact:

Mr. Ernest Harrison, EM Phone: 705-474-7282
Mr. Marty Martinello, B.A. Fax: 705-474-5491

Or
Mr. Peter Brodie Brown Phone: 416-368-9595
Mr. Robert Chase, B.A. Fax: 416-368-0584
Email: mlsm@passport.ca
Website: www.millstreammines.com
Report TOU ViolationShare This Post
 Public ReplyPrvt ReplyMark as Last ReadFilePrevious 10Next 10PreviousNext