SI
SI
discoversearch

We've detected that you're using an ad content blocking browser plug-in or feature. Ads provide a critical source of revenue to the continued operation of Silicon Investor.  We ask that you disable ad blocking while on Silicon Investor in the best interests of our community.  If you are not using an ad blocker but are still receiving this message, make sure your browser's tracking protection is set to the 'standard' level.
Gold/Mining/Energy : Bearcat (BEA-C) & Stampede (STF-C)

 Public ReplyPrvt ReplyMark as Last ReadFilePrevious 10Next 10PreviousNext  
To: Keith Minler who wrote (1794)1/26/1999 2:35:00 PM
From: TANTRAMAR  Read Replies (2) of 2306
 
Hi Keith:

I was out to the Turner Valley area on Sunday and had a look at all of the BEA/STF well sites. The only site at which there was any activity was the # 1 well, where a service rig was actively working. No flaring was taking place at the time that I drove by. As I understand it this rig was to prepare the well for production. I watched the work at the well briefly, but I don't have the knowledge to say exactly what they were doing. They appeared to inserting tubing (of which type I am not sure) into the well. The same service rig has been at this well since the last time I drove by (first week of January).

I wonder what happens next after the rig has completed work at this well. I believe there was talk in the news releases of having a service rig do testing work at the 7-25 well that was deepened last fall. Does anyone on the thread know what the future plans are?

Regards From Alberta
Report TOU ViolationShare This Post
 Public ReplyPrvt ReplyMark as Last ReadFilePrevious 10Next 10PreviousNext