SI
SI
discoversearch

We've detected that you're using an ad content blocking browser plug-in or feature. Ads provide a critical source of revenue to the continued operation of Silicon Investor.  We ask that you disable ad blocking while on Silicon Investor in the best interests of our community.  If you are not using an ad blocker but are still receiving this message, make sure your browser's tracking protection is set to the 'standard' level.
Gold/Mining/Energy : Nuinsco Resources (NWI)

 Public ReplyPrvt ReplyMark as Last ReadFilePrevious 10Next 10PreviousNext  
To: Buckey who wrote (1843)3/17/1999 6:59:00 PM
From: mineman  Read Replies (3) of 5821
 
600 m X 100 m X 2.3 m = 140,000 cu.m X 2.7 t/cu.m = 370,000 tons.
(Projection based on 2.3 metre thick zone intersected in only 3 holes)

Gross metal value: $320/ton X 370,000 tons = $120 million
(Based on 8% Ni X $2/lb = $320/ton (US) nickel)

So from 3 early-stage holes the higher-grade zone appears to be thin (2.3 m.) and is projected to be small (perhaps 370,000 tons) but with good gross value ($320/ton).

Factors that could change this estimate:

-The zone's thickness could increase down plunge to the east,
-The zone's length could be over 1 km long instead of 600 m,
-The sulphides could be originating from a larger feeder zone, and
-There could be a series of zones with similar grade in the area.
Report TOU ViolationShare This Post
 Public ReplyPrvt ReplyMark as Last ReadFilePrevious 10Next 10PreviousNext