SI
SI
discoversearch

We've detected that you're using an ad content blocking browser plug-in or feature. Ads provide a critical source of revenue to the continued operation of Silicon Investor.  We ask that you disable ad blocking while on Silicon Investor in the best interests of our community.  If you are not using an ad blocker but are still receiving this message, make sure your browser's tracking protection is set to the 'standard' level.
Gold/Mining/Energy : Trump's 12 Diamond Picks, Discussions Limited

 Public ReplyPrvt ReplyMark as Last ReadFilePrevious 10Next 10PreviousNext  
To: George J. Tromp who wrote (1998)4/15/1999 12:14:00 PM
From: VAUGHN  Read Replies (1) of 2251
 
Hello George

News off the wire this A.M.:

1999 Drill Program Commences on Kimberlite Targets at Yamba Lake, Northwest Territories

New Kimberlite Targets to be Tested
Detailed Airborne Survey Completed

CALGARY, April 15 /CNW/ - Tanqueray Resources Ltd. (TQY-ASE) together
with joint venture partners, Mill City International Inc. (MIY-VSE) (MIYN-OTC)
and Cypango Ventures Ltd. (CAV-VSE) are pleased to announce that SouthernEra
Resources Ltd. (SUF-TSE) has commenced drilling on the 152,506 acre claim
block in the Yamba Lake Area of the Northwest Territories. SouthernEra has
the right to earn a 51% interest in the property by expending $10 million on
or before December 31, 2002. Once SouthernEra has vested at 51%, the
remaining interests in the property would be Tanqueray - 19%, Mill City - 19%
and Cypango 11%.
An 8,000 line kilometer high resolution helicopter mounted magnetic and
electromagnetic airborne geophysical survey has been completed over the entire
Yamba Lake project using 100 metre spacing flight lines. The results of this
survey combined with the previously flown 200 metre line spacing will assist
in defining kimberlite targets. Ground geophysics commenced in late March to
follow-up on a number of additional targets identified by the new airborne
results.
Kimberlitic indicator minerals continue to be recovered from more than
1,000 till samples collected last summer. Several pyrope garnets with
excellent G-10 chemistry, which cannot be traced to the previously discovered
kimberlites, have been recovered from samples. This would seem to indicate the
presence of further kimberlite bodies.
The 1999 drill program commenced with the drilling of a target in the
southern portion of the claim block. When this has been completed, the drill
will systematically test other newly identified targets as ice conditions
permit. In addition, the Ptarmigan and T-10 pipes, originally drilled by Mill
City/Tanqueray in 1994 and Cypango in 1997 respectively, will be re-drilled.
The Companies are encouraged by the new geophysical results and expect to
continue the drill programme into the summer, in order to evaluate land-based
and near-shore kimberlitic targets. All kimberlites will be tested for diamond
content. Additional results will be reported when available.
Neither the Alberta Stock Exchange nor the Vancouver Stock Exchange have
approved or disapproved the information contained herein.

-30-
For further information: TANQUERAY RESOURCES LTD., Linda Falkenberg,
Director, (403) 263-9055, Fax: (403) 263-9061, MILL CITY INTERNATIONAL INC.,
Larry D. Revitt, President, (403) 640-0110, Fax: (403) 640-4024, CYPANGO
VENTURES LTD., Michael Sweatman, President, (604) 684-4312, Fax: (604)
681-9651

************
SouthernEra announces major platinum acquisition

- SouthernEra to Purchase Messina Holdings' Controlling 54.17% Interest
in Messina Limited. Messina Limited owns 100% of Messina Platinum
Mines Limited.
- Measured Resource of + 51 Million Tonnes to 1,000 Metres.
- Mine Credits Include Platinum, Palladium and Other Platinum Group
Metals (PGM), as well as Gold, Nickel, Copper and Cobalt.
- Pre-Feasibility Study Indicates After Tax Net Earnings for the Project
to be Approximately C$23 million Per Annum.

-------------------------------------------------------------------------

TORONTO, April 15 /CNW/ - SouthernEra Resources Limited (SUF - TSE), one
of the leading diamond exploration and mining companies in the world, today
announced its plans to expand into the noble precious metals group, most
notably platinum and palladium.
SouthernEra has entered into an agreement with Messina Holdings Limited,
a wholly owned subsidiary of Impala Platinum Holdings Limited (Implats), to
acquire, at an estimated cost of US$10.5 million, their 54.17% controlling
interest in Messina Limited, a South African company listed on the
Johannesburg Stock Exchange. Messina Limited's assets include its wholly owned
subsidiary, Messina Platinum Mines Limited and approximately R58 million
(US$9.4 million) in cash.
The agreement follows a long due diligence process and the production of
a detailed pre-feasibility study under the direction of SouthernEra and
independently reviewed by one of South Africa's leading engineering consulting
groups - Steffen, Robertson & Kirsten (SRK). The pre-feasibility study was
carried out at a cost of over C$1 million and requires little further work to
convert to a full feasibility study.
Terms of the agreement require SouthernEra to complete a bankable
feasibility study within approximately four months. The feasibility study is
expected to demonstrate that the Messina platinum mine will generate a rate of
return of at least 20%. The pre-feasibility showed a 24% rate of return. The
transaction is also subject to several other conditions precedent, which will
be satisfied before the completion of the bankable feasibility study. Assuming
completion of the acquisition, SouthernEra will make an offer on similar terms
to the remaining shareholders of Messina Limited.
''We are very excited about this acquisition which forms part of our
plans to expand the company and which, moreover will provide steady, very long
term income to fund further growth and enhance shareholder value,'' says Chris
Jennings, President, SouthernEra Resources Limited. ''We believe it will make
a very good fit with our diamond business. The fundamentals of the PGM
business are good. We also look forward to working closely with and
benefitting from the experience of Impala Platinum Holdings Limited.''
The Messina Platinum Mines property is located 16 kilometres southeast of
SouthernEra's Klipspringer Mine office in the Northern Province of South
Africa. Klipspringer is SouthernEra's primary diamond production project.
SouthernEra is confident that the close proximity will create synergies
between the two operations, which will result in cost savings.
In addition to an initial annual production of about 120,000 oz of
Platinum Group Metals and Gold, the pre-feasibility study indicates that the
mine is expected to produce approximately 1,406 tonnes of Nickel, 848 tonnes
of Copper and 27 tonnes of Cobalt annually.
SouthernEra plans to process the ore only to the concentrate stage. ''The
elimination of the need to build a smelter and refinery on site will
substantially reduce the capital costs and eliminate the need to acquire
specialised platinum marketing skills,'' adds Jennings.

MORE THAN 33 YEAR LIFE OF MINE.

SouthernEra plans to mine both reefs on the Voorspoed section
simultaneously at a rate of 60,000 tonnes per month. At this rate, the
Voorspoed section is projected to have a life of over 33 years. This is
expected to provide long term, steady cash flow for SouthernEra, which will
augment the cash flow from the projected long life of the Klipspringer
fissures.
A significant amount of work (at a cost of +- C$29 million) has been done
on the property in the past. There is some surface infrastructure and a
vertical shaft to 325 metres on the Voorspoed section. This will also result
in substantial capital savings.

LARGE RESOURCE.

The Messina Platinum Mines Mineral Leases cover both precious and base
metals over several farms, totaling 5,439 hectares in extent on which a strike
length of 16 kilometres of both the Merensky and the UG2 platinum reefs have
been delineated. These two important reefs, which dip at an average of 58
degrees are separated by 120 metres. The steep dip of the reefs will enable
the use of more productive and economical mining methods than those used at
the mines on these reefs elsewhere in the Bushveld Igneous Complex, which dip
at an average of 14 degrees.
The resources of the Voorspoed and Doornvlei sections have been
delineated by 155 drill holes, most with multiple intersections. These
resources are to a depth of 1,000 metres and for Voorspoed, where mining will
commence, have been calculated after applying a 25% geological loss factor.
The total resource for the above two sections to 1,000 metres, is 51
million tonnes at a grade of 6.4 g/t PGM + Au, containing 10.48 million oz of
PGM's +Au. There is further potential for substantially increasing resources
on the property both westwards along strike and down dip.
SouthernEra Resources Limited was taken over by present management in
1992 with the goal of becoming a leader in exploration, mining and production.
The company is currently one of the world's leading diamond producers.
SouthernEra holds exploration rights for properties in more than 7 countries,
most notably South Africa, Canada's Northwest Territories, Brazil and Angola.
The company employs more than 300 people and has a solid reputation for
technical excellence and the highest ethical standards. SouthernEra expects to
employ 920 people at its new platinum mine. This will provide much-needed jobs
in a very economically depressed area of Northern Province.
The company is committed to growth through geographical and geological
diversification and believes that this commodity diversification into the
promising and growing platinum and palladium business will provide consistent
long-term revenue.
Analysts, the Press and Fund Managers are invited to a briefing at
SouthernEra's Office at 4 p.m. to-day.

************

Mountain Province Mining Inc. - Monopros/De Beers discovers new kimberlite pipe between the 5034 and hearne pipes

VANCOUVER, April 14 /CNW/ - Mountain Province Mining, Inc. (the
''Company'') is pleased to announce that it has been notified by its
contractor, Monopros Limited (''Monopros''), a wholly owned subsidiary of De
Beers Consolidated Mines Ltd, that a new kimberlite, pipe, located between the
5034 and Hearne pipes, has been discovered.
The new kimberlite pipe was intersected while drilling a lake-based
geophysical target (EM high), approximately 300 meters Southwest of the 5034
pipe. The discovery drill hole was inclined at -50 degrees with an azimuth of
325 degrees (towards the Northwest). The hole intersected 36 meters of
kimberlite between 60 and 104 meters giving a horizontal projection of 22
meters. Based on the available information, Monopros believes that the maximum
dimension of the pipe is unlikely to exceed 60 meters. The pipe lies on a
linear Southwest to Northeast trend along which the Hearne pipe, the 5034 pipe
and the Tuzo pipe also lie.
The exploration drilling program is part of ongoing efforts to discover
additional kimberlite occurrences. It started March 31 as previously
announced in the news release of April 9th. The initial drill targets are in
Kennady Lake in an effort to locate additional kimberlite bodies close to the
four existing pipes. Any new discoveries would add to the resource size and
could have a positive effect on the economics of the Kennady lake cluster of
pipes.
Following detailed core logging, samples of the new kimberlite will be
forwarded by Monopros to the De Beers laboratories in South Africa for
microdiamond, mineral chemistry and other analysis.
Four additional exploration holes will be drilled in Kennady Lake before
drilling in several other areas on the AK claims.
The Company is obviously very pleased with this discovery as it
demonstrates that more kimberlites exist and will hopefully be discovered.
The AK and CJ claims, located in the Northwest Territories of Canada, are
held 90% by Mountain Province Mining, Inc., and 10% by Camphor Ventures
(VSE:CFV). As reported in the press release on March 7, 1997, Mountain
Province Mining, Inc. and its partners have entered into a joint venture
agreement with Monopros, under which Monopros has the right to earn up to a
60% interest in the AK and CJ properties.

On Behalf of the Board of Mountain Province Mining, Inc.

''Jan W. Vandersande, Ph.D.''
-----------------------------
Jan W. Vandersande, Ph.D.
President

This release may contain forward-looking statements, within the meaning
of the ''safe-harbor'' provision of the Private Securities Litigation Reform
Act of 1995, regarding the Company's business or financial condition. Actual
results could differ materially from those described in this news release as a
result of numerous factors, some of which are outside of the control of the
company.

Regards


Report TOU ViolationShare This Post
 Public ReplyPrvt ReplyMark as Last ReadFilePrevious 10Next 10PreviousNext