I think that this is what the smart money is buying on as opposed to the most recent announcement of the new JV Kennecott pipe.
Exploration update from Tahera Corporation
(TSE: TAH)
TORONTO, March 29 /CNW/ - Tahera Corporation (''Tahera'') has completed a preliminary delineation drilling program on the Contwoyto - 1 kimberlite pipe. The Contwoyto - 1 pipe, one of four diamondiferous kimberlites discovered thus far at Tahera's wholly owned Jericho and Contwoyto Diamond Projects in the Northwest Territories (Nunavut on April 1, 1999), is located approximately 400 km northeast of Yellowknife. Fourteen drill holes totaling 1,801 meters were drilled to determine the shape of the pipe between 19 meters and 140 meters vertical depth, and the kimberlite was probed to a maximum depth of 220 meters. The kimberlite pipe is pear shaped and has horizontal dimensions of approximately 60 meters by 80+ meters, and appears to be open at depth. Differential GPS survey of drill collars along with down-hole orientation surveys were used to accurately locate drill holes and contacts. Specific gravity measurements from core samples will be compiled to determine a tonnage factor for the kimberlite. All of the above data will be used to determine the volume of kimberlite contained within the Contwoyto - 1 pipe. Additional caustic fusion analysis will be performed on representative sections of the drill core as Tahera continues to evaluate the diamond content of the Contwoyto - 1 kimberlite. The previously reported microdiamond results from preliminary caustic fusion analysis of the discovery hole, drilled in November 1998, returned 169 diamonds from 90.2 kg of core. Of the 169 stones recovered, 26 stones measured greater than 0.5 mm in one dimension, and 12 stones measured greater than 0.5 mm in two dimensions. The drill program will now focus on exploration targets in the immediate Contwoyto - 1 area, followed by targets in the vicinity of the Jericho pipes. Current plans call for ten to fourteen targets to be drilled in the program, which is expected to continue until the end of April 1999.
Kennecott Joint Venture Kennecott Canada Exploration Inc. (''Kennecott'') has commenced exploration drilling on the Hood River property, located approximately 100 km north of the Jericho Project. Drilling on the Ice Claims (approximately 80 km south of the Jericho Project) and Rockinghorse properties (approximately 120 km northwest of the Jericho Project) is scheduled to commence in early April 1999. Approximately 30 - 35 kimberlite targets on the three joint venture properties are scheduled for drilling during the current program, which is expected to continue until early May 1999. Kennecott is in the third year of the joint venture agreement that entitles it to earn a 50% interest in the three properties by making expenditures of $50 million, of which approximately $10.6 million has been spent to date. The Toronto Stock Exchange neither approves nor disapproves of the information contained herein.
%SEDAR: 00003313E
-30-
For further information: please contact: Grant Ewing, Vice President Investor Relations and Corporate Development, Tel: (416) 777-1998, Fax: (416) 777-1898, Email: investor@tahera.com, tahera.com |