SI
SI
discoversearch

We've detected that you're using an ad content blocking browser plug-in or feature. Ads provide a critical source of revenue to the continued operation of Silicon Investor.  We ask that you disable ad blocking while on Silicon Investor in the best interests of our community.  If you are not using an ad blocker but are still receiving this message, make sure your browser's tracking protection is set to the 'standard' level.
Politics : Formerly About Advanced Micro Devices -- Ignore unavailable to you. Want to Upgrade?


To: Saturn V who wrote (64914)7/12/1999 5:18:00 PM
From: Steve Porter  Read Replies (1) | Respond to of 1579897
 
Saturn,

You are forgetting one thing in your post:

Once the die size becomes very small a shrink is typically not worth the effort. The product cost is dominated by the material cost of the package. A plastic package will cost $6 to $ 10, while a ceramic package like the one used by K-6 will cost $15 to $30.

Once they shrink the K6-2 from .25 to .18 they can probably drop the operating voltage, thereby lower the power consumption, thereby move to a plastic pacakge, and save $9 - $25 a chip. Well worth the transition IMHO.

Steve



To: Saturn V who wrote (64914)7/12/1999 6:03:00 PM
From: Ali Chen  Read Replies (1) | Respond to of 1579897
 
Saturn-VIII, <Once the die size becomes very small a shrink is typically not worth the effort.>

What??????? The effort will give AMD the MHZ they
desperately need to sell the chips.

<The higher MHZ on 0.18 for K-6 will not improve
performance since the CPU will become memory starved.>
One more theorist of performance. You equally can
apply this argument to any processor, P-III, Xeon,
K7, etc. Go tell Intel they do not need the CuLATERmine
with 600MHz: there will be a big laugh.