SI
SI
discoversearch

We've detected that you're using an ad content blocking browser plug-in or feature. Ads provide a critical source of revenue to the continued operation of Silicon Investor.  We ask that you disable ad blocking while on Silicon Investor in the best interests of our community.  If you are not using an ad blocker but are still receiving this message, make sure your browser's tracking protection is set to the 'standard' level.
Gold/Mining/Energy : MPVIF Mountain Province Mining -- Ignore unavailable to you. Want to Upgrade?


To: .Trev who wrote (2012)7/19/1999 5:15:00 PM
From: skelly  Read Replies (2) | Respond to of 2577
 
Trev and All:
Here is the report put out by Klassens at Goepel McDermid on the last PR :
| Home | Register! | Community | My Bull | Login | Logout | RT Quotes |


Mountain Province Mining (MPVIF) Message List
Real Time Quote
Chart
Free E-Mail
Raging MPVIF Links

< Previous Respond Next >

By: Luckyray
Reply To: None Thursday, 15 Jul 1999 at 3:35 PM EDT
Post # of 17


new at copying and pasting,but this was sent to me yesterday,from mpvif.

MOUNTAIN PROVINCE MINING INC. (MPV-T, $3.40) - SPECULATIVE BUY
ROBERT KLASSEN
(604) 659-8285
Encouraging Bulk Sample Results from Kennady Lake
Mountain Province Mining (MPV) yesterday announced positive bulk sample results from the Kennady
Lake diamond project (36% MPV / 60% De Beers) in the Northwest Territories. Kennady Lake has the
potential to be Canada's third diamond mine. Results to date are comparable to the earlier data from the
Ekati mine (Dia Met 29% / BHP 51%) and Diavik project (Aber 40% / Rio Tinto 60%). We rate MPV as
a Speculative Buy with a one-year target price of $4.00 per share however, further encouraging results
over the summer could push MPV stock to the $5.00 level. Our longer term target for MPV is $9.00 per
share.
Kennady Lake is situated 120-km south of Lac de Gras. De Beers is the project operator and can earn a
60 percent interest in the project by funding a bulk sample, completing a feasibility study and taking the
project through to production. Four diamondiferous pipes, the 5034, Hearne, Tuzo, and Tesla have been
delineated for a preliminary resource of 36 million tonnes. Modeled grades and values per carat were
assigned to each pipe from mini-bulk data collected during 1998. De Beers completed a bulk sample
program during the winter of 1999 to collect approximately 500 tonnes from each pipe (See MPV Insight
January 28, 1999 for details).
Initial results released yesterday from the 1999 winter bulk sample on the 5034 pipe were a little better
than expected. The 5034 pipe returned a grade of 1.71 carats per tonne based on 573 tonnes with the
largest diamond being 10 carats. Average values per carat are pending. For comparison, the 50 tonne
mini-bulk sample collected in 1998 for the 5034 pipe returned modeled grades of 1.6 carats per tonne at
US$51 per carat, with the largest diamond recovered being 2.88 carats.
A total of 13 reverse circulation holes were drilled on the 5034 to a depth of 300 metres recovering 614
tonnes. 980 carats were recovered from 573 tonnes of material using a commercial size 1.5-mm square
screen cutoff. Results for the remaining 41 tonnes will be reported when available. Diamond distribution
within the sample population is good with the three largest diamonds recovered being 10.0, 4.90 and 4.85
carats respectively. In total their were seven diamonds greater than 3 carats, 42 diamonds greater than 1
carat, 113 diamonds between ½ (50 points) carat and 1 carat, and 606 diamonds between 1/5 (20 points)
and 1/2 (50 points) carat. The average value per carat for the parcel is pending.
MPV trades at a significant discount relative to its peer group. This reflects the earlier stage nature of the
Kennady Lake project. MPV share price implies a 10 percent discount rate on cash flows from a mine at
Kennady Lake. For comparison, Aber's share price reflects a 7 percent discount rate on cash flow from
Diavik while Dia Met's share price reflects a 3 percent discount rate on cash flow from Ekati. We feel
the discount rate on MPV will be reduced as the project advances to feasibility, while higher grade or
stone valuations would add direct value to the project. Increased focus on the Canadian diamond sector
and continued strengthening in the multiples awarded to the peer group, namely Dia Met and Aber, could
also result in a higher valuation for MPV.
MPV has all the makings of a great diamond development story. Technical results from Kennady Lake
continue to meet or exceed expectations and are comparable with early results for Diavik and Ekati. A
steady flow of news should help maintain interest as bulk sample grade and valuation results for the
Hearne, Tuzo and Tesla pipes will be reported throughout the summer. Caustic fusion results will be
reported within the next week for the two new kimberlite bodies, the Wallace and the Faraday, discovered
this past winter at Kennady Lake.

(Voluntary Disclosure: Position- Long)



BoardMark MemberMark Ignore Poster Report TOS Violation

MPVIF Update
Last 2 3/8
Chg. + 5/32
% +7.04%
Time 15:59
Detailed | Real-Time


Nasdaq delayed 15 minutes, 20 min. otherwise.

Your $0.02 Wanted!
Why just lurk?
Get in the ring.
Click Here


Previous | Next | Post New | Respond | View Replies
Favorite Boardmarks
| HM | MPV.TO | MPVIF | NEM | SKG.TO | WSP.V

--------------------------------------------------------------------------------
Message Board Search

Symbol Subject Member Board Directory
Computer-RelatedGeneral BoardsInternet-RelatedMembers' CornerMiscellaneousNon-TechnologyOTC BBTechnologyTelecommunicationsThe Bull PubThe Writers' GuildUnder $4

--------------------------------------------------------------------------------
Home | Community | Free Email | My Bull | Login | Logout | RT Quotes |
Copyright 1997-99 Raging Bull, Inc. All Rights Reserved
Terms and Conditions