We've detected that you're using an ad content blocking browser plug-in or feature. Ads provide a critical source of revenue to the continued operation of Silicon Investor.  We ask that you disable ad blocking while on Silicon Investor in the best interests of our community.  If you are not using an ad blocker but are still receiving this message, make sure your browser's tracking protection is set to the 'standard' level.
Gold/Mining/Energy : PolyMet Mining Corp POM.V (was Fleck Resources) -- Ignore unavailable to you. Want to Upgrade?


To: GWalker who wrote (686)8/18/1999 8:08:00 PM
From: Chuca Marsh  Read Replies (1) | Respond to of 708
 
Nice find, By George. O'Kane Consulatants says $8.11 cost per T, so with the new $18.15 Tonne we are at a GREAT PROFIT RATION. Keep on testing, maybe the 10 bucks profite can go up, in Jan 2000 tests...why NOT!
<<..Processing assumptions incorporated in the analysis of alternatives include: 1) the grade
of ore
(millfeed) and associated recoveries, as determined in previous testing at Lakefield,
would be as
stated in the table below; 2) ground ore would be processed in a flotation circuit to
produce 1,200
tonnes/day of bulk concentrate; 3) the concentrate would be pressure leached in
autoclaves at 220
degrees Centigrade; 4) PGMs and gold would be recovered from the leach solution; 5)
copper
would be recovered as LME grade copper cathode in a conventional copper SX-EW
circuit; 6)
nickel and cobalt would be sequentially recovered by solvent extraction, followed by
electrowinning of nickel to make cathodes, and the precipitation of saleable cobalt
sulfide.

Copper Nickel Cobalt Platinum Palladium Gold
Ore (millfeed)...>>