We've detected that you're using an ad content blocking browser plug-in or feature. Ads provide a critical source of revenue to the continued operation of Silicon Investor.  We ask that you disable ad blocking while on Silicon Investor in the best interests of our community.  If you are not using an ad blocker but are still receiving this message, make sure your browser's tracking protection is set to the 'standard' level.
Politics : Formerly About Advanced Micro Devices -- Ignore unavailable to you. Want to Upgrade?


To: Petz who wrote (70636)9/1/1999 7:50:00 PM
From: Shane Geary  Respond to of 1574007
 
Petz - Re: "losing one "lot" of wafers does not strike me as a disaster, if the source of the contamination was found."

I don't know if this is sarcasm on your part, but it is far more likely that you lose many lots than a single lot in these situations.

Cu contamination is not monitored on every lot - I wonder how often it is tested for? I suppose that you could run a test wafer through every exposed tool once per day and then test for metallics using SIMS or TXRF or some analysis technique. Even if one high throughput tool (and the tools which are likely to get contaminated are probably all high throughput, like wet benches and clean tools) was affected you could be talking many hundreds of wafers per day of exposure.

Hey - it happens. And the best time for it to happen is before volume production, but on the other hand it wouldn't give much confidence in it not happening again (in a different mechanism).

On a different issue - how long does it take for this damn fab to ramp up????? Groundbreaking was 3 years ago!! I've never seen a fab take this long - there must have been huge amounts of chopping and changing over the past 3 years.

From amd.com

Fab 30 Project Timeline
December 1995 AMD announces its Dresden project

October 1996 Ground breaking for facility

May 1997 Cornerstone ceremony

September 1997 Topping off ceremony

May 1998 Clean room ready for equipment

November 1998 Start of First Silicon

December 1998 First yielding SRAMs

January 1999 First yielding AMD-K6® family processors

Q1 1999 Begin installation of copper tools

Q2 99 Start of first copper lots (AMD-K6 family processors)

Planned for Q4 99 Start of AMD Athlon processor production



To: Petz who wrote (70636)9/2/1999 1:21:00 AM
From: Paul Engel  Read Replies (4) | Respond to of 1574007
 
Petz - Re: ", losing one "lot" of wafers does not strike me as a disaster, if the source of the contamination was found."

One Lot ?

I heard AMD lost A MONTH's WORTH of WAFERS in Progress.

By the way - have you ever seen a fab while EVERY QUARTZ Diffusion/Oxidation TUBE is removed and TRASHED - and every process chamber is shut down, disassembled, cleaned, recleaned, and recleaned again, etc., etc.

Guess how much production goes on when this panic reaction takes place?

Paul