We've detected that you're using an ad content blocking browser plug-in or feature. Ads provide a critical source of revenue to the continued operation of Silicon Investor.  We ask that you disable ad blocking while on Silicon Investor in the best interests of our community.  If you are not using an ad blocker but are still receiving this message, make sure your browser's tracking protection is set to the 'standard' level.
Gold/Mining/Energy : Winspear Resources -- Ignore unavailable to you. Want to Upgrade?


To: russet who wrote (24356)9/7/1999 6:43:00 PM
From: teevee  Read Replies (1) | Respond to of 26850
 
russet,

Most ore deposits(diamond deposits included) are developed incrementally through a number of expansion phases. Adding additional crushing milling, sorting capacity is the quick, comparatively cheap part. The major expense is developing the underground workings/headings. For an example of an underground mine expanding to 5000 tonnes per day from different access points, and mining a narrow sheet, often with thicknesses less than 6 feet(1.8 meters), but with a steeper dip, and with comparable value per tonne to Snap Lake, check this site out:

stillwatermining.com

I don't have a problem with a "modest" initial production rate at Snap Lake. IMO, maximum daily mining rates could eventually exceed the proposed mining rate at Diavik, or get to between 4200 and 5000 tonnes per day or more. I believe this could take two or three years after initial production commences, and through two or three expansion phases. The rumor mill suggests that this is at least a year away as the talk on SW is of a 25-30,000 tonne underground bulk sample included in this upcoming season's program.
regards,
teevee