We've detected that you're using an ad content blocking browser plug-in or feature. Ads provide a critical source of revenue to the continued operation of Silicon Investor.  We ask that you disable ad blocking while on Silicon Investor in the best interests of our community.  If you are not using an ad blocker but are still receiving this message, make sure your browser's tracking protection is set to the 'standard' level.
Gold/Mining/Energy : Corner Bay Silver (BAY.T) -- Ignore unavailable to you. Want to Upgrade?


To: Syncrude who wrote (370)11/18/1999 11:35:00 AM
From: Claude Cormier  Respond to of 4409
 
Thanks Syncrude... Got a read it.



To: Syncrude who wrote (370)11/18/1999 11:36:00 AM
From: marcos  Read Replies (2) | Respond to of 4409
 
Resuming now .. b/a 10.0x2.40/2.40x20.5 ... we should do alright - 100 millions mineable ounces, 0.39:1 strip ratio .. we got a mine, and a good one .. experiment follows -


Table 3 Alamo Dorado Project Economic Pit Design Parameters
---------------------------------------------------------------
Ag and Au Recovery - High-Grade 70%
Ag Price US $5.28/oz (US $0.17/g)
Au Price US $300/oz (US $9.65/g)
Mining Cost - Tonne of material US $0.90/tonne
Processing Cost - High Grade US $2.80/tonne
Strip Ratio (waste to ore) 0.39:1
Average slope angle (Final Pit) 42 degrees
In-Pit Road width 20 meters
Road Grade 8%
Bench Face Angle 70%
Mining Bench height 5 meters
Inter-ramp slope angle 49 degrees
Fixed berm width 9.0 meter catch bench
every 5 meters