We've detected that you're using an ad content blocking browser plug-in or feature. Ads provide a critical source of revenue to the continued operation of Silicon Investor.  We ask that you disable ad blocking while on Silicon Investor in the best interests of our community.  If you are not using an ad blocker but are still receiving this message, make sure your browser's tracking protection is set to the 'standard' level.
Gold/Mining/Energy : Corner Bay Silver (BAY.T) -- Ignore unavailable to you. Want to Upgrade?


To: Elizabeth Andrews who wrote (556)12/23/1999 1:41:00 AM
From: russet  Respond to of 4409
 
Suggest some numbers. The site is close to highways, water, power etc.,..I considered transportation of the heap leach precipitate was considered to be included in the cost to process. Insurance was considered to be included in overhead. I gave a $3 million overhead, which is double many cost effective operations I'm familiar with.

If there is any smelter royalties, I'm unfamiliar with them. Please advise.

This is a heap leach operation. I assumed smelter costs of a high silver content precipitate product would be low, and included in the costs given to me by Claude.

Time to give me your estimates, and I will include them in the current formula, along with Claude's corrections already posted and present a new calculation after Christmas.

The ball is in your court, and the hamster's calculator awaits your guidance.