SI
SI
discoversearch

We've detected that you're using an ad content blocking browser plug-in or feature. Ads provide a critical source of revenue to the continued operation of Silicon Investor.  We ask that you disable ad blocking while on Silicon Investor in the best interests of our community.  If you are not using an ad blocker but are still receiving this message, make sure your browser's tracking protection is set to the 'standard' level.
Gold/Mining/Energy : Gold and Silver Mining Stocks -- Ignore unavailable to you. Want to Upgrade?


To: E. Charters who wrote (11)2/3/2000 12:56:00 AM
From: d:oug  Read Replies (2) | Respond to of 4051
 
E. Charters, is Wildcat Resources Ltd. a private company ?

My StockTalk Search gets null for "wildcat".

There is a thread in your name, looks as if you have a newsletter.
Is this thread about the company you is president of ?

<<...is into a 5 ounce per ton narrow vein mine in NWT. We are not hedged and do not feel the need to be. We may float the financing with a gold loan though.
EC<:-}
mailto:e_charter@yahoo.com>>

doug



To: E. Charters who wrote (11)2/3/2000 10:40:00 AM
From: Ptaskmaster  Read Replies (1) | Respond to of 4051
 
PANGEA REPORTS ADDITIONAL DRILL RESULTS FROM GOLDEN RIDGE PROJECT.
"Improving grades confirm potential to expand the resource-

"Pangea Goldfields Inc today released additional results from the ongoing diamond drill program at the Golden Ridge project in Tanzania. The project is located in the Lake Victoria Goldfields area,...
----snip----
"To date, results confirm that the inclusion of quartz vein intersections could provide a more accurate picture of the gold distribution and significantly enhance the average grade of the deposit. The weighted average grade of the oblique holes is 3.72 grams/tonne gold as compared to the weighted average of 2.66 grams/tonne gold for holes drilled at right angles to the banded iron formation.
----snip----
"Elsewhere in Tanzania, drilling has commenced at both the Tulawaka project and at the Bulyanhulu South project. Drilling is scheduled for the first half of the year at the Muhama project which is contiguous to the east of Tulawaka."

Full Company Press Release at
biz.yahoo.com