SI
SI
discoversearch

We've detected that you're using an ad content blocking browser plug-in or feature. Ads provide a critical source of revenue to the continued operation of Silicon Investor.  We ask that you disable ad blocking while on Silicon Investor in the best interests of our community.  If you are not using an ad blocker but are still receiving this message, make sure your browser's tracking protection is set to the 'standard' level.
Gold/Mining/Energy : Corriente Resources V.CTQ Junior Exploration Co. -- Ignore unavailable to you. Want to Upgrade?


To: WillC who wrote (1406)8/24/2000 8:43:11 AM
From: jerry janko  Respond to of 1416
 
Seems like we've ignored the SI thread on corriente in favour of bullboards:
Corriente mobilizes second drill to copper belt

Corriente Resources Inc CTQ
Shares issued 21,492,832 Aug 18 close $1.22
Mon 21 Aug 2000 News Release
Mr. Kenneth Shannon reports
A second drill has been contracted to assist with the copper exploration
program currently under way in the Corriente copper belt, Ecuador. This new
drill will start testing high-grade copper targets at the north end of the
belt. The first holes are planned in the area of the Panantza property,
with drilling to start in mid-September. Targets near Panantza include
secondary copper zones such as the one intersected by two previous holes
drilled by Billiton in 1998. Secondary copper (mainly oxide) results for
the two holes are as follows:

Orientation From To Width Cu
(m) (m) (m) %
PA03
Vertical 0 27 27 1.3

PA09
Angle
-57 degrees
to 101 degrees 0 77 77 1.1

These two holes are over 200 metres apart and the mineralization is open
for expansion in several directions. Additional targets in the area include
numerous untested copper soil anomalies, which are associated with bedrock
alteration consistent with the occurrence of porphyry copper
mineralization. These targets include identified porphyry systems at
Panantza east and Trinidad.
Drilling on the Mirador project at the south end of the Corriente copper
belt will be completed in early September. A total of 42 holes will have
tested the Mirador system. Assay results will be made available following
the end of the program. The drill will then be moved a few kilometres south
to the Chancho project. The target at Chancho is interpreted as a fault
controlled diorite dyke, with approximate dimensions of 1,600 by 60 metres.
Numerous rock chip samples suggest the possibility of an average grade in
excess of 1 per cent copper. The copper is contained in primary sulphide
minerals, which have excellent potential to extend to significant depth. cheers, jerry



To: WillC who wrote (1406)9/14/2000 7:56:58 AM
From: jerry janko  Read Replies (1) | Respond to of 1416
 
Mr. Dan Carriere reports
All the results have been received for the latest drilling on the Mirador
project, Corriente copper belt, Ecuador. Results indicate the discovery of
a large copper-gold porphyry deposit with strong primary copper grades and
a significant gold credit. The best assay interval to date is in hole 35
with 263 metres of 0.98 per cent copper equivalent. A number of holes show
an improvement in grade with depth as shown by hole 16 which averages 0.48
per cent copper equivalent from surface to 62 metres depth but then
increases to 1.03 per cent copper equivalent for the last 59 metres of
drilling (from 155 to 214 metres) which is the end of the hole. Most of the
drill holes bottomed within mineralized rock and show that Mirador has
excellent depth potential. Mirador appears to be a conventional porphyry
copper-gold system with classic high-level alteration features such as
abundant silicification. Consistent with this interpretation is the
predominant breccia texture found in the drill holes which appears to be
related to several intrusive breccia bodies which are typically found in
the upper portions of porphyry copper systems. Results greater than 0.5 per
cent copper equivalent for all the holes drilled to date are shown on the
following table: (a drill plan map and assays for unmineralized or
low-grade intervals are available at the company Web site).

From To Interval Au Cu
Hole (m) (m) Cu (g/t) Equiv.

2 39 69 30 .88 .122 .94
69 198 129 .64 .126 .70

4 62 77 15 .49 .146 .56

5 45 156 111 .55 .195 .64
182 194 12 .69 .165 .77

6 8 42 34 .82 .208 .91
54 78 24 .82 .223 .94
78 93 15 .46 .207 .56
93 120 27 .75 .256 .87
120 147 27 .47 .162 .55
147 200 53 .73 .235 .85

7 10 26 16 .74 .250 .87
26 74 48 .42 .210 .52
74 104 30 .57 .282 .71

8 11 87 76 .84 .100 .94
87 158 71 .49 .125 .55

9 52 60 8 .79 .166 .86
99 114 15 .53 .139 .60
123 138 15 .61 .131 .67

10 10 112 102 .67 .278 .80
112 124 12 .45 .169 .53
124 142 18 .62 .276 .75

11 24 139 115 .81 .207 .90
139 151 12 .48 .163 .55

12 38 55 17 .99 .223 1.10
64 115 51 .66 .193 .75
130 211 81 .76 .276 .90

13 34 45 11 1.00 .183 1.09
45 73 28 .59 .197 .68
115 153 38 .62 .238 .74

14 29 58 29 .46 .163 .54
58 127 69 .85 .161 .92
127 151 24 .42 .194 .52

15 43 62 19 .70 .349 .87
62 74 12 .40 .435 .62
74 176 102 .74 .304 .89

16 62 119 57 .73 .275 .86
119 155 36 .53 .164 .61
155 214 59 .86 .359 1.03

17 38 47 9 .92 .316 1.07
47 116 69 .50 .194 .59
116 131 15 .71 .225 .82

18 15 56 41 .86 .386 1.04
56 86 30 .68 .447 .90

19 18 35 17 .81 .251 .93
35 106 71 .57 .113 .62

20 19 56 37 .35 .409 .55
56 89 33 .55 .400 .74
101 212 111 .75 .198 .85

25 58 68 10 .95 .146 1.02

30 29 50 21 .45 .117 .51
50 107 57 .56 .257 .68
116 125 9 .58 .128 .64
149 161 12 .85 .129 .90

31 0 14 14 .54 .143 .61
26 149 123 .75 .253 .87
149 161 12 .44 .128 .50
161 170 9 .65 .179 .73
182 194 12 .60 .091 .63
215 248 33 .62 .182 .70
263 280 17 .70 .140 .77

32 93 105 12 .51 .200 .61
231 295 64 .94 .216 1.05

33 50 281 231 .64 .249 .77

35 40 303 263 .82 .332 .98

41 0 63 63 .70 .192 .79
72 126 54 .58 .216 .69
150 168 18 .77 .078 .80

42 22 156 134 .70 .247 .83
243 261 18 .53 .141 .60
273 294 21 .74 .137 .81
Copper equivalent is calculated using a formula where one gram per tonne Au
is equivalent to 0.5 per cent copper. All drill holes are vertical except
for holes 1, 24 and 25 which are drilled at -60 to -70 degrees.
The highest grade holes lie within an area of approximately 600 by 800
metres which is open to the northwest and to the east. Within this zone,
using the light drill rig, hole depths ranged from 100 to 300 metres,
averaging about 190 metres. All holes within this area had significant
intervals above a 0.5 per cent copper cutoff. Total lengths of greater than
0.5 per cent Cu intercepts varied from 38 metres in hole 9 to 263 metres in
hole 35, and averaged over 130 metres in the 24 holes within the block. The
average copper equivalent grade for all of these greater than 0.5 per cent
Cu intercepts is 0.79 per cent copper equivalent. Mineralization remains
wide open for expansion to depth. According to J. David Lowell, who is
managing exploration of the Corriente copper belt, "Mirador represents the
upper part of a copper system, which means excellent potential for
additional resources to be identified at the project." As a general
observation, the variable grade at Mirador would naturally lend itself to a
selective mining approach where high-grade intervals would be mined and
processed through a mill and lower grade intervals would be stockpiled for
later treatment. Such selective mining could significantly improve project
economics by increasing early cash flows.
Mirador is the second copper target drilled since Corriente/Lowell became
operator of the project at the beginning of the year. In each case a
significant copper deposit has been indicated by the first phase drilling.
The drill has now been moved from Mirador, three kilometres southwest, to
the high-grade Chancho project which has several surface targets assaying
over 1 per cent copper. Testing of this target will start immediately.
Drilling in the northern part of the Corriente copper belt will commence in
late September on the Panantza project with a second drill. The initial
target at Panantza is a high-grade oxide copper (greater than 1 per cent)
zone outlined by previous drilling. Panantza lies to the west of the San
Carlos project, which has an inferred resource of 400 million tonnes of 0.7
per cent copper. All of these deposits and targets are contained within the
Corriente copper belt joint venture with Billiton PLC.cheers