SI
SI
discoversearch

We've detected that you're using an ad content blocking browser plug-in or feature. Ads provide a critical source of revenue to the continued operation of Silicon Investor.  We ask that you disable ad blocking while on Silicon Investor in the best interests of our community.  If you are not using an ad blocker but are still receiving this message, make sure your browser's tracking protection is set to the 'standard' level.
Technology Stocks : LAST MILE TECHNOLOGIES - Let's Discuss Them Here -- Ignore unavailable to you. Want to Upgrade?


To: MikeM54321 who wrote (7882)8/4/2000 10:21:56 PM
From: ftth  Respond to of 12823
 
Hi Mike, I didn't have any premium channels previously. I believe the difference is entirely in the modem lease being waived. I went ahead and scheduled an install. They said it will take about 1.5 hours. "HUH???," I said. The rep said they have about a half hour of outside stuff to do, about a half hour of inside stuff to do, and about a half hour tutorial on the IPG. I can't for the life of me figure out why any of these pieces should take so long, and I'll be falling asleep 5 minutes into the IPG tutorial zzzzzzzzz.
We'll see.

But ponder this regarding this claimed strong demand for digital services: I could have gotten the install next week but had to put it off til the following week. At 1.5 hours per install, each installer probably does 4 per day including travel time between jobs and 4 donut breaks. Don't know how many installers they have for this service, but the backlog can't be all that high considering the ease they scheduled me in (and I called them, remember).