SI
SI
discoversearch

We've detected that you're using an ad content blocking browser plug-in or feature. Ads provide a critical source of revenue to the continued operation of Silicon Investor.  We ask that you disable ad blocking while on Silicon Investor in the best interests of our community.  If you are not using an ad blocker but are still receiving this message, make sure your browser's tracking protection is set to the 'standard' level.
Gold/Mining/Energy : Strictly: Drilling and oil-field services -- Ignore unavailable to you. Want to Upgrade?


To: Douglas V. Fant who wrote (81935)12/17/2000 9:00:37 AM
From: Second_Titan  Read Replies (4) | Respond to of 95453
 
The EIA projects for 2001 that fuel oil use for power will be about 17% of NG use.

An interesting aspect of the power reliability is if each power pool is effectively ensuring that they have enough non NG fired capacity available. As NG fired combined cycle plants replace older oil/gas fired rankine cycle plants and coal plants they will be exposed to any event disrupting supply of NG.

I wonder how many of the dozens of GT's were ordered with dual fuel capability? This is an expensive option. Since many of these turbines were ordered on speculation I expect many would not have the fuel oil option. Why spend the capital to compete for a small window of time in the Winter? With NG supply low relative to demand NG availability may drop further and further south, so curtailment periods may increase for some and may hit some plants who never expected it.

Gas Turbine World Handbooks for the last two years show that the vast majority of plants were ordered without the fuel oil option.