SI
SI
discoversearch

We've detected that you're using an ad content blocking browser plug-in or feature. Ads provide a critical source of revenue to the continued operation of Silicon Investor.  We ask that you disable ad blocking while on Silicon Investor in the best interests of our community.  If you are not using an ad blocker but are still receiving this message, make sure your browser's tracking protection is set to the 'standard' level.
Strategies & Market Trends : Stocks to Watch -- Ignore unavailable to you. Want to Upgrade?


To: Al Collard who wrote (135)3/8/2001 8:38:35 PM
From: Al Collard  Read Replies (1) | Respond to of 592
 
"Stock to Watch"...PFN-v

Pacific North West Capital Corp. (PFN.CDNX) is pleased to report initial
drill results from the first 7 holes of its Phase 4 diamond drill program,
now in progress on the River Valley Platinum Group Metal property located
near Sudbury, Ontario. The current drill program involves 2 drill rigs, one
of which is systematically drilling off sections spaced at approximately
25m intervals through the >900m long, north-south trending Dana Lake
deposit. The second drill is testing numerous widely spaced targets
associated with the contact of the River Valley intrusion, which extends
for >6km southeast of the Dana Lake deposit and includes Lismer's Ridge.

Current drilling has confirmed the presence of extremely rich PGM,
sulphide-associated mineralisation at the South Zone, including 4.50m @
10.13 g/t Pt+Pd+Au (DL-01), 4.00m @ 4.11 g/t Pt+Pd+Au (DL-02), and 4.40m @
12.14 g/t Pt+Pd+Au (DL-03). In addition, an intersection from Lismer's
Ridge assayed 18.00m @ 4.72 g/t Pt+Pd+Au including 2.05m @ 28.14 g/t
Pt+Pd+Au (LR-02), the highest grade intersection to date.

Thus far, a total of 24 new holes have been completed in the Dana Lake and
Lismer's Ridge areas, and core logging, sampling and assaying is in
progress. PGM assays (PGM=Pt+Pd+Au) from mineralised drill core
intersections are reported below. Copper, nickel and rhodium values will be
reported at a later date.

Dana Lake Area

Initial drilling is centered at the South Zone and is aimed at evaluating
the strike and depth extent of mineralisation intersected in drill holes
RV-11, RV-12, RV-13, and RV-36 which were completed during the Phase 1 and
3 drill programs.

DL-01 (128W/175S) 217m/90degrees/-45

-------------------------------------------------------------
>From To Int. Int. Au Pt Pd PGM* PGM*
(m) (m) (m) (ft) (ppb) (ppb) (ppb) (ppb) (g/t)
-------------------------------------------------------------
140.00 179.00 39.00 127.96 107.7 499.5 1752.0 2359.3 2.36
incl.
141.20 167.00 25.80 84.65 137.0 631.1 2263.3 3031.5 3.03
incl.
143.30 150.15 6.85 22.47 319.4 1675.6 6115.8 8110.8 8.11
-------------------------------------------------------------
*PGM=Pt+Pd+Au

DL-02 (128W/150S) 152m/90degrees/-45

-------------------------------------------------------------
>From To Int. Int. Au Pt Pd PGM* PGM*
(m) (m) (m) (ft) (ppb) (ppb) (ppb) (ppb) (g/t)
-------------------------------------------------------------
47.40 145.00 97.60 320.23 66.8 291.3 890.0 1248.2 1.25
-------------------------------------------------------------
incl.
47.40 104.50 57.10 187.35 60.9 427.4 1377.9 1866.1 1.87
-------------------------------------------------------------
incl.
53.70 66.50 12.80 42.00 81.9 715.7 2369.3 3166.9 3.17
-------------------------------------------------------------
incl.
84.50 88.50 4.00 13.12 144.3 918.0 3048.3 4110.5 4.11
-------------------------------------------------------------
*PGM=Pt+Pd+Au

DL-03 (162W/150S) 239m/90degrees/-45

>From To Int. Int. Au Pt Pd PGM* PGM*
(m) (m) (m) (ft) (ppb) (ppb) (ppb) (ppb) (g/t)
-------------------------------------------------------------
153.90 213.80 59.90 196.53 63.6 482.7 1331.9 1878.3 1.88
-------------------------------------------------------------
incl.
153.90 196.50 42.60 139.77 64.9 569.0 1546.8 2180.6 2.18
-------------------------------------------------------------
incl.
153.90 158.30 4.40 14.44 297.3 3476.9 8364.3 12138.5 12.14
-------------------------------------------------------------
incl.
182.00 188.00 6.00 19.69 85.9 585.3 2155.4 2826.6 2.83
-------------------------------------------------------------
*PGM=Pt+Pd+Au

Mineralisation at the South Zone is open to the north and south, has been
intersected between vertical depths of 33m and 200m, is open to depth and
can be traced to surface outcroppings. Additional drilling is in progress
to determine its geometry.

Regional Drill Program -- Lismer's Ridge

Initial holes from the regional program are collared at the Lismer's Ridge
area, located approximately 1.3km southeast of the South Zone at the Dana
Lake Area. At Lismer's Ridge, mineralisation was intersected in earlier
drill holes from the P3 program (RV-38, 39 and 40). Although the regional
drilling is widely spaced and essentially reconnaissance in nature, the
initial assay results, tabulated below, indicate the highly prospective
nature of the intrusive contact zone. Extremely high individual assays
intersected over narrow intervals in LR-02, including 13.4 g/t PGM over
1.55 m and 73.7 g/t PGM over 0.50 m, are most encouraging.

LR-01 (1273SE/698NE) 92m/45degrees/-45

>From To Int. Int. Au Pt Pd PGM* PGM*
(m) (m) (m) (ft) (ppb) (ppb) (ppb) (ppb) (g/t)
-------------------------------------------------------------
8.00 38.00 30.00 98.43 49.0 253.9 772.2 1075.1 1.08
-------------------------------------------------------------
incl.
8.00 17.95 9.95 32.65 84.4 499.7 1693.3 2277.4 2.28
-------------------------------------------------------------
*PGM=Pt+Pd+Au

LR-02 (1333SE/644NE) 206m/45degrees/-45

-------------------------------------------------------------
>From To Int. Int. Au Pt Pd PGM* PGM*
(m) (m) (m) (ft) (ppb) (ppb) (ppb) (ppb) (g/t)
-------------------------------------------------------------
100.50 118.50 18.00 59.06 99.3 1380.5 3236.8 4716.6 4.72
-------------------------------------------------------------
incl.
100.50 105.70 5.20 17.06 217.4 3981.2 9011.1 13209.7 13.21
-------------------------------------------------------------
incl.
101.75 103.80 2.05 6.73 440.3 8455.9 19246.2 28142.4 28.14
-------------------------------------------------------------
*PGM=Pt+Pd+Au

LR-03 (1192SE/664NE) 95m/45degrees/-45
:anomalous PGM values

LR-04 (1375SE/623NE) 197m/45degrees/-45

-------------------------------------------------------------
>From To Int. Int. Au Pt Pd PGM* PGM*
(m) (m) (m) (ft) (ppb) (ppb) (ppb) (ppb) (g/t)
-------------------------------------------------------------
100.50 118.50 18.00 59.06 99.3 1380.5 3236.8 4716.6 4.72
134.90 180.10 45.20 148.30 44.9 213.3 555.2 813.4 0.81
-------------------------------------------------------------
incl.
145.10 166.30 21.20 69.56 60.3 315.8 799.5 1175.5 1.18
-------------------------------------------------------------
incl.
157.40 161.60 4.20 13.78 81.0 414.2 1283.4 1778.6 1.78
-------------------------------------------------------------
*PGM=Pt+Pd+Au

Mineralisation at Lismer's Ridge is open to the northwest and southeast,
has been intersected between vertical depths of 5m and 127m, is open to
depth, and can be traced to surface outcroppings.

The main objective of the current regional drilling program is to identify
discrete near-surface zones of mineralisation along the contact with the
intent to drill them off in detail during subsequent drill programs. The
regional program will eventually extend southeast along the intrusive
contact and will test numerous targets including the area around the Varley
showing, and further east to the Azen Creek and Jackson's Flats; together
these 3 areas cover >4km of prospective intrusive contact.

The higher grade values intersected in DL-02 and LR-02 and in several of
the previously drilled holes, including RV-36, indicate excellent potential
for the development of mineral resources exploitable by underground
methods, in addition to the primary bulk tonnage, open pit target.
Moreover, drilling to date demonstrates the consistency in grade and width
for mineralisation at the Dana Lake Area.

Drilling will continue until late March at which time it will be suspended
temporarily for a period of approximately four weeks in order to allow
results to be plotted and interpreted in an orderly manner. Preliminary
resource studies are already in progress and will be up-dated following
completion of the current phase of drilling. Anglo Platinum has advised
that it will shortly complete metallurgical studies on drill core from the
Dana Lake Area and PFN expects to be able to report principal conclusions
at that time.

Some of the best intersections prior to the Phase 4 drill program are:

--------------------------------------------------------------------
Drill Area- From To Int. Int. Au Pt Pd PGM* PGM*
Hole Phase (m) (m) (m) (ft) (ppb) (ppb) (ppb) (ppb) (g/t)
--------------------------------------------------------------------
RV-01 Dana-1 41.72 45.15 3.43 11.25 219 1228 4108 5555 5.56
--------------------------------------------------------------------
RV-05 Dana-1 37.10 49.60 12.50 41.01 167 778 2456 3401 3.40
--------------------------------------------------------------------
RV-18 Dana-2 253.60 261.20 7.60 24.94 235 1213 3426 4874 4.87
--------------------------------------------------------------------
RV-36 Dana-3 186.15 194.95 8.80 28.87 385 1658 5173 7216 7.22
--------------------------------------------------------------------
RV-37 Dana-3 51.15 61.05 9.90 32.48 127 939 2503 3569 3.57
--------------------------------------------------------------------
*PGM=Pt+Pd+Au

The River Valley property is under option to Anglo American Platinum
Corporation Limited which can earn up to a 65% interest in the property by
bringing it into commercial production. During the past 2 years, Anglo has
funded exploration programs totalling $2 million on PFN properties; PFN is
operator of the exploration programs. In 2001, Anglo is funding additional
programs amounting to Can $2 million, including the current 11,000 metre
diamond drill program which is expected to be completed by June 2001. Upon
completion of the current program, an estimated 100 holes totalling 18,000m
will have been drilled on the River Valley property.

Located 60km northeast of Sudbury and road accessible, the principal
economic target on the River Valley property is a postulated multi-million
tonne bulk tonnage platinum group metal deposit of size and grade
comparable to that reported by North American Palladium Ltd. for its Lac
des Iles mine near Thunder Bay Ontario (measured and indicated resource
(July 2000) 121.7 m.t. at 1.63 g/t Pd, 0.18 g/t Pt, 0.13 g/t Au, 0.06% Cu,
and 0.05% Ni). Lac des Iles mine is the only primary PGM producer in
Canada.