SI
SI
discoversearch

We've detected that you're using an ad content blocking browser plug-in or feature. Ads provide a critical source of revenue to the continued operation of Silicon Investor.  We ask that you disable ad blocking while on Silicon Investor in the best interests of our community.  If you are not using an ad blocker but are still receiving this message, make sure your browser's tracking protection is set to the 'standard' level.
Gold/Mining/Energy : Canadian-under $3.00 Stock-Picking Challenge -- Ignore unavailable to you. Want to Upgrade?


To: jpthoma1 who wrote (4781)11/10/2001 3:43:09 PM
From: Al Collard  Read Replies (1) | Respond to of 11802
 
Hi JP,

Your in with GNG-v @$.42 for 23,809 shares.

Chart for Golden Goliath Resources Limited:

stockcharts.com[l,a]djcanimy[dc][pc20!b50!b100!b200!f][vc60][iUb14!Ll14!La12,26,9!Lp14,3,3!Lc20]

From the chart of GNG we can see the stock broke down last week and is now trading under all it's major MA's. The chart indicators are all bearish and heading down. What this stock needs is a good dose of drilling results to turn itself around. The collapse through the support of the 100MA on Friday is not a good sign however. JMO

Good luck with this pick,
Al



To: jpthoma1 who wrote (4781)11/14/2001 3:26:17 PM
From: Al Collard  Respond to of 11802
 
GNG-v...in the news.

Golden Goliath begins drilling program at Unuachic

Wed 14 Nov 2001

News Release

Mr. J. Paul Sorbara reports

The diamond drilling program is now under way at the company's Unuachic
camp. The first area being drilled is the San Timoteo property, where six
to eight holes are currently planned. Hole ST-0141 was started on Nov. 1
and was designed to extend to 250 metres, with the target zone (a strong
chargeability high within a geological unit hosting an old adit) expected
at about 100 metres. Water line problems made progress slow and on Nov. 11,
at a depth of 115 metres, the drill bit and shell broke off and water
return was lost. This situation could not be rectified and the hole had to
be abandoned. Drill hole ST-0141A, which is on the same section as No. 1,
is being prepared and will start later today or tomorrow. The water line
has now been upgraded which will allow for faster progress.
Drill hole ST-01411 ended (115 metres) in a sequence of lapilli tuff
breccia cemented with carbonte, with pyrite, fluorite and strong epidote
alteration that is cut by andesite dikes. The company's geologists are
pleased with this assemblage. The 115 metres of core from the first hole
have now been logged and samples have been selected for assay. The results
will be released when several holes have been completed.
The drilling program has a $1-million budget and it is currently planned to
include 20 to 24 diamond drill holes on four of the company's 100 per cent
owned Uruachic properties. The properties, or areas, will be drilled in
order of logistical access, starting with San Timoteo and then moving to La
Reforma, Corona and then Oteros. This will be the first drilling that has
ever been undertaken on these properties. This program will continue
through February of next year.
Additional geophysical work (induced polarization) designed to extend
coverage over anomalies located in the northeastern part of La Reforma and
the northwestern part of Oteros have now been completed. Both of these
anomalies have been significantly enlarged and represent excellent drill
targets that the company plans to test during the current drill program.
Representatives from a major mining company, including top technical
people, who visited the Uruachic camp earlier this year, are returning for
a second visit at the end of November. The purpose of this trip is to visit
areas unseen in their first visit and to view the core. Golden Goliath is
delighted with their interest level and with the project in general.