We've detected that you're using an ad content blocking browser plug-in or feature. Ads provide a critical source of revenue to the continued operation of Silicon Investor.  We ask that you disable ad blocking while on Silicon Investor in the best interests of our community.  If you are not using an ad blocker but are still receiving this message, make sure your browser's tracking protection is set to the 'standard' level.
Gold/Mining/Energy : Precious and Base Metal Investing -- Ignore unavailable to you. Want to Upgrade?


To: Elizabeth Andrews who wrote (3150)4/21/2002 2:17:12 PM
From: jackjc  Respond to of 39344
 
Elizabeth: <Heap leach bulk sample>

Heard from Alamos last wk: No local problem. A contractor from Hermosillo will be stripping
250kT using his 85T trucks, exposing 100kT ore (not 50), stripping permits in hand, using contractor
blast permits, but need to build an explosives shed ($20k). Then track drill will be run in again
to very accurately determine grade (since the hope is to improve recoveries few %, would need
tight initial grade info). Construct small pad and load 20kT ore using Alamos 35T trucks (about
half million worth of Alamos equip located within 200km). Could be pouring some gold by yr end.
Could then continue with their equip on the bal of 80kT ore.

Looks like an efficient way to get started using contractor larger equip for efficiency and time
saving on some of the permits. Instead of a one shot bulk sample, can continue with some
exposed ore on a low vol basis. Have no idea how much this can help with expenses, but I
personally have confidence they are just the right people to work Mulatos.

Overall planning is in progress now and so no reporting by them yet.



To: Elizabeth Andrews who wrote (3150)4/21/2002 2:22:40 PM
From: jackjc  Respond to of 39344
 
Elizabeth: Forgot to add that Alamos has also CIL ckt and everything else needed for
this limited part of the operation in Mexico.