SI
SI
discoversearch

We've detected that you're using an ad content blocking browser plug-in or feature. Ads provide a critical source of revenue to the continued operation of Silicon Investor.  We ask that you disable ad blocking while on Silicon Investor in the best interests of our community.  If you are not using an ad blocker but are still receiving this message, make sure your browser's tracking protection is set to the 'standard' level.
Technology Stocks : Advanced Micro Devices - Moderated (AMD) -- Ignore unavailable to you. Want to Upgrade?


To: ptanner who wrote (82739)6/18/2002 12:10:04 AM
From: wanna_bmwRead Replies (2) | Respond to of 275872
 
PT, Re: "Fab 22 Chandler AZ (2001, 0.13 logic, 200mm)
Fab 23 Colorado Springs CO (2001, 0.18 flash converting to 0.13 in 2002, 200mm)
Fab 11X extension in Rio Rancho NM (2002, 0.13 logic, 300mm)
Fab 24 Leixlip Ireland (2004 - under construction but on hold per 02Q1 CC, 300mm)
Or maybe this includes the D1D development fab Hillsboro OR (2003 - under construction, 300mm)."


We seem to hear many times about all these Intel fabs, and how Intel is wasting money if there isn't a huge uptick in demand. Of course, I recognize this, too - who wouldn't?

But we've been counting the fabs that Intel is constructing, or converting. Do you also have information on fabs which are being obsoleted, or decommissioned? I thought I saw that fabs 7 and 9 were being decommissioned, but there might be more. It could be cheaper to build a new location if either: a) a previous location has some environmental hazards (i.e. fabs 8 and 18 in Israel!!), or b) if renovation costs exceed construction costs of a more cost efficient fab (perhaps as in the case of fabs 7 and 9). I'd like to find out more about Intel's Israel fabs, and others that they might think about replacing. It might be the missing piece of the puzzle, IMO.

wbmw