We've detected that you're using an ad content blocking browser plug-in or feature. Ads provide a critical source of revenue to the continued operation of Silicon Investor.  We ask that you disable ad blocking while on Silicon Investor in the best interests of our community.  If you are not using an ad blocker but are still receiving this message, make sure your browser's tracking protection is set to the 'standard' level.
Gold/Mining/Energy : A to Z Junior Mining Research Site -- Ignore unavailable to you. Want to Upgrade?


To: 4figureau who wrote (2540)1/9/2003 9:58:25 AM
From: 4figureau  Read Replies (1) | Respond to of 5423
 
NGX:

Northgate Exploration releases year-end Kemess results
Northgate Exploration Ltd NGX
Shares issued 190,551,115 Jan 8 2003 close $ 1.57
Thursday January 9 2003 News Release
Mr. Ken Stowe reports
NORTHGATE REPORTS RECORD OPERATING RESULTS
Northgate Exploration has released record quarterly and annual operating results from its Kemess South mine in British Columbia.
Highlights
Kemess had record annual gold production of 282,300 ounces in 2002, including 77,500 ounces of production in the fourth quarter. In addition, Kemess had record annual copper production of 72.9 million pounds, including 20.2 million pounds in the fourth quarter.
Fourth quarter mill availability was 91 per cent and has exceeded the operating target of 90 per cent in each of the past six months.
New records for quarterly gold and copper recoveries were set during the fourth quarter of 2002. Gold and copper recoveries were 74 per cent and 86 per cent, compared with the previous records of 71 per cent and 83 per cent, established in the second quarter of 2002. These higher recoveries are a direct result of excellent performance of the two column flotation cells commissioned in the second quarter, which has dramatically exceeded original expectations.
Average mill throughput for 2002 was 47,420 tonnes per day, up over 12 per cent from the 42,084-tonne-per-day throughput recorded in 2001. Fourth quarter mill throughput was 48,803 tonnes per day compared with 46,920 in the same period of 2001.


2002 KEMESS MINE PRODUCTION TABLE
Fourth quarter results
(100% of production basis)

2002 2001

Tonnes milled
(ore) 4,489,862 4,316,659

Average mill
operating
rate (tpd) 48,803 46,920

Gold grade (g/t) 0.730 0.790

Copper grade (%) 0.236 0.255

Gold recovery (%) 74 65

Copper recovery (%) 86 78

Gold production
(ounces) 77,552 71,452

Copper production
(000s pounds) 20,264 18,993

2002 KEMESS MINE PRODUCTION TABLE
Year-end results
(100% of production basis)

2002 2001

Tonnes milled
(ore) 17,308,000 15,361,000

Average mill
operating
rate (tpd) 47,420 42,100

Gold grade (g/t) 0.724 0.855

Copper grade (%) 0.236 0.251

Gold recovery (%) 70 66

Copper recovery (%) 81 77

Gold production
(ounces) 282,300 277,100

Copper production
(000s pounds) 72,900 66,300




Ken Stowe, president and chief executive officer, commented: "The various production records established in the fourth quarter of 2002 are the result of the dedicated efforts of our management team over the past two years as we have worked to unlock the true operating potential of the Kemess South mine. In 2003, we will continue to optimize the Kemess operation with the installation of an expert computer system in the mill to increase throughput and the commissioning of a new production drill, which will dramatically improve blasting productivity in the open pit. In 2003, we anticipate an increase in gold production to 294,000 ounces. Operational success at the Kemess South mine and the prospects for reserve growth at Kemess North, combined with the higher price of gold and our well-capitalized balance sheet, has positioned Northgate to generate substantial, sustainable value for its shareholders."