SI
SI
discoversearch

We've detected that you're using an ad content blocking browser plug-in or feature. Ads provide a critical source of revenue to the continued operation of Silicon Investor.  We ask that you disable ad blocking while on Silicon Investor in the best interests of our community.  If you are not using an ad blocker but are still receiving this message, make sure your browser's tracking protection is set to the 'standard' level.
Gold/Mining/Energy : Precious and Base Metal Investing -- Ignore unavailable to you. Want to Upgrade?


To: Step1 who wrote (11679)5/30/2003 10:47:44 AM
From: E. Charters  Read Replies (1) | Respond to of 39344
 
My opinion is they don't have anything mineable there. To mine 3 grams underground you would need loads of the stuff, like 10 million tons to support a mill. If they are talking open pit stuff that is heap leachable they still need lots and lots of tons. I note this stuff is shallow. We don't know what they are looking at metallurgically here, so it is idle speculation. You need about 100,000 ounces for a small near surface rip and heap leach mine. That is 1.7 million tons. At 150 feet deep, and ten feet wide, that is 13,000 feet long. Maybe that is not what they can prove, or are trying to prove, but the announcement itself does not let us know anything regarding their target development.

EC<:-}



To: Step1 who wrote (11679)5/31/2003 12:49:26 AM
From: Elizabeth Andrews  Respond to of 39344
 
Okay it's time for Step 2. Any company that reports in width in feet and grade in grams is trying to embellish the unembellishable. No serious speculator is going to pay any attention to this and the board of NDT should do a quick review of itself.



To: Step1 who wrote (11679)6/1/2003 3:09:27 AM
From: E. Charters  Respond to of 39344
 
This is a better picture of their drilling. I guess they
did feet because that is how people measure in the US, but grams/metric tonne were how the assay labs report. As some how these announcements are for CDN investors only and must be 43-101 compliant. This means changes to the assay results cannot be made by anyone, even in the case of conversions.


Drill
hole

id from to length gtlen gs/au gs/ag oz/Au oz/Ag AuEQ AuEq.gr
CC-2 45 54 9 9 2.75 72 0.08 2.09 0.106 0.106

CC-3 54 63 9 9 1.83 75 0.053 2.19 0.080 0.08

CC-4 21 24 3 1.64 0.047 0.047
and 96 102 6 6 2.62 50 0.076 1.46 0.094 0.094

CC-5 39 42 3 2.3 35 0.067 1.02 0.080
and 129 132 6 6 1.66 66 0.048 1.92 0.072 0.072

CC-7 21 27 6 6 2.72 45 0.079 1.31 0.095 0.095
and 45 60 15 15 2.78 64 0.081 1.86 0.104 0.104

CC-8 54 60 6 6 1.6 40 0.046 1.16 0.061 0.061
and 99 102 3 4.42 112 0.129 3.26 0.170

CC-9 63 69 6 6 3.12 92 0.091 2.68 0.125 0.125
and 72 75 3 1.64 68 0.047 1.98 0.072
and 81 84 3 3.7 59 0.108 1.72 0.130
and 93 96 3 1.13 0.033 0.033

CC-10 42 45 3 1.01 0.029 0.029
and 78 84 6 6 2.31 54 0.067 1.57 0.087 0.087
and 99 111 12 12 1.8 38 0.052 1.11 0.066 0.066
and 117 120 3 1.72 36 0.05 1.05 0.063

CC-11 42 51 9 9 1.43 61 0.042 1.79 0.064 0.064
and 84 87 3 1.49 42 0.043 1.22 0.058

CC-12 72 78 6 6 1.79 0.052 0.052 0.052
and 87 99 12 12 3.13 114 0.091 3.32 0.133 0.133

CC-13 21 27 6 6 1.32 0.038 0.038 0.036
and 66 72 6 6 1.49 60 0.043 1.75 0.065 0.065

average 6.125 8.000 2.142 62.263 0.062 1.814 0.080 0.083



EC<:-}