SI
SI
discoversearch

We've detected that you're using an ad content blocking browser plug-in or feature. Ads provide a critical source of revenue to the continued operation of Silicon Investor.  We ask that you disable ad blocking while on Silicon Investor in the best interests of our community.  If you are not using an ad blocker but are still receiving this message, make sure your browser's tracking protection is set to the 'standard' level.
Gold/Mining/Energy : Precious and Base Metal Investing -- Ignore unavailable to you. Want to Upgrade?


To: Condor who wrote (25998)12/28/2003 8:16:17 AM
From: E. Charters  Read Replies (2) | Respond to of 39344
 
rehab, track, shaft. -- present drifts are 8 X 8. The 500 dollar cost sounds a tad high. I remember we charged out 350 a foot, and that was track, pipe and profit included. You can probably do it for about 250 a foot in house.

Your only costs are dynamite, labour, bits, fuse, air, water, track, pipe and timber.

3 shifts, or 6 man shifts should give you 8 feet of advance no problemo. That is 1500 labour. Dynamite and fuse is 150 at most, bits about 100, track and pipe about 500, timber/rockbolts about 240. All other overhead and support about 300. Maintenance and costs for equipment about 100 let's say. That is 2900 for 8 feet of 8' X 8'. $363/foot at the outside hmmmmm.. You could do better with trackless and jumbo.

EC<:-}