We've detected that you're using an ad content blocking browser plug-in or feature. Ads provide a critical source of revenue to the continued operation of Silicon Investor.  We ask that you disable ad blocking while on Silicon Investor in the best interests of our community.  If you are not using an ad blocker but are still receiving this message, make sure your browser's tracking protection is set to the 'standard' level.
Politics : Don't Blame Me, I Voted For Kerry -- Ignore unavailable to you. Want to Upgrade?


To: Orcastraiter who wrote (11029)3/31/2004 12:05:03 PM
From: BearcatbobRespond to of 81568
 
Pipeline Quick Facts

The Trans-Alaska Pipeline System was designed and constructed to move oil from the North Slope of Alaska to the northern most ice- free port- Valdez, Alaska.
Length: 800 miles.
Diameter: 48 inches.
Crosses three mountain ranges and over 800 rivers and streams.
Cost to build: $8 billion in 1977, largest privately funded construction project at that time.
Construction began on March 27, 1975 and was completed on May 31, 1977.
First oil moved through the pipeline on June 20, 1977.
Over 13 billion barrels have moved through the Trans Alaska Pipeline System.
First tanker to carry crude oil from Valdez: ARCO Juneau, August 1, 1977.
Tankers loaded at Valdez: 16,781 through March 2001.
Storage tanks in Valdez- 18 with total storage capacity of 9.1 million barrels total.
The mission of Alyeska’s Ship Escort Response Vessel System is to safely escort tankers through Prince William Sound.