We've detected that you're using an ad content blocking browser plug-in or feature. Ads provide a critical source of revenue to the continued operation of Silicon Investor.  We ask that you disable ad blocking while on Silicon Investor in the best interests of our community.  If you are not using an ad blocker but are still receiving this message, make sure your browser's tracking protection is set to the 'standard' level.
Gold/Mining/Energy : Kostroma State District Power Station -- Ignore unavailable to you. Want to Upgrade?


To: Copperfield who wrote (1)5/27/2004 5:25:42 PM
From: Copperfield  Respond to of 27
 
I am looking into the price quoted for the upgrade (RUB220 billion). I believe that billion is mispelled and it is actually "million". So RUB220 million would be about $7.6 million US.

Other 2004 repairs (machine translation by

worldlingo.com

--------------------------------------------

On 9 February at Kostroma GRES - STATE REGIONAL ELECTRIC POWER PLANT
begins the repair campaign of 2004. What tasks do stand before the repairmen? About this tells the chief of a service of repair JOINT STOCK COMPANY
"Kostroma GRES - STATE REGIONAL ELECTRIC POWER PLANT" in.V. Gubenkov:

- the repair campaign of this year begins from routine repair of power
unit ¹ 4. One must inspect iron of stator with the output of the rotor of
generator. Then in the innovation repair will be brought out power unit ¹ 6. The replacement of the convective steam super-heater of high pressure
is planned, the modernization of control system of power unit on the base of the
software-and-hardware complex OF "QUINTS". On the power unit ¹ 5 in the period of medium repair one must carry
out the same volumes, that also on the block ¹ 6.

Routine repairs of power units ¹ 1, 2, 3, 7 and 8 are not assumed additional volumes. On the block ¹ 9 is planned the dissection of the second low-pressure
cylinder and the inspection of the welds of the rotor of low pressure
¹ 2.

These are basic volumes.

In the first quarter competitive tradings on the selection of the
executors of works will be carry ouied. Seventy five percent of the volumes of works (guaranteed volumes) will
be returned to daughterly energoremontnym enterprises.