SI
SI
discoversearch

We've detected that you're using an ad content blocking browser plug-in or feature. Ads provide a critical source of revenue to the continued operation of Silicon Investor.  We ask that you disable ad blocking while on Silicon Investor in the best interests of our community.  If you are not using an ad blocker but are still receiving this message, make sure your browser's tracking protection is set to the 'standard' level.
Politics : A Neutral Corner -- Ignore unavailable to you. Want to Upgrade?


To: Constant Reader who wrote (63)9/17/2005 12:09:58 AM
From: TimF  Read Replies (1) | Respond to of 2253
 
BTW, we are a congenial lot here.

Yes, no longer conjugal...



To: Constant Reader who wrote (63)9/18/2005 10:49:15 PM
From: long-gone  Respond to of 2253
 
(though not stated is current/future) - actual revision was likely made because of living / housing included
frwebgate.access.gpo.gov
Jefferson Parish
GENERAL DECISION: LA20030014 05/06/2005 LA14

Date: May 6, 2005
General Decision Number: LA20030014 05/06/2005

Superseded General Decision Number: LA020014

State: Louisiana

Construction Types: Building

Counties: Jefferson, Orleans, Plaquemines, St Bernard, St
Charles, St James, St John the Baptist and St Tammany Counties
in Louisiana.

BUILDING CONSTRUCTION PROJECTS (Does not include Treatment
Plants or single family homes & apartments up to and including
4 stories)

Modification Number Publication Date
0 06/13/2003
1 12/29/2003
2 01/30/2004
3 03/12/2004
4 04/02/2004
5 05/21/2004
6 07/09/2004
7 10/15/2004
8 11/19/2004
9 02/04/2005
10 04/08/2005
11 05/06/2005

ELEC0130-006 09/01/2004

JEFFERSON, ORLEANS, PLAQUEMINES, ST. BERNARD, ST. CHARLES, ST.
JAMES, AND ST. JOHN THE BAPTIST PARISHES:

Rates Fringes

Electrician (includes low
voltage wiring and
installation of fire alarms,
security systems, sound and
communication systems,
telephones, computers, and
temperature controls)..........$ 22.09 6.00
----------------------------------------------------------------
ELEC1077-003 03/01/2005

ST. TAMMANY PARISH:

Rates Fringes

Electrician (includes low
voltage wiring and
installation of fire alarms,
security systems, sound and
communication systems,
telephones, computers, and
temperature controls)..........$ 17.99 5.15
----------------------------------------------------------------
IRON0058-011 06/01/2004

JEFFERSON, ORLEANS, PLAQUEMINES, ST. BERNARD, ST. CHARLES, ST.
JAMES (Southeastern Portion), ST. JOHN THE BAPTIST, AND ST.
TAMMANY PARISHES:

Rates Fringes

Ironworker, reinforcing and
structural.....................$ 18.05 5.52
----------------------------------------------------------------
IRON0623-007 06/01/2004

ST. JAMES PARISH (Northwestern Portion):

Rates Fringes

Ironworker, reinforcing and
structural.....................$ 18.05 5.22
----------------------------------------------------------------
* PAIN1244-001 04/01/2005

Rates Fringes

Glazier........................$ 16.62 4.67
Painter (includes brush;
roller; spray; and drywall
finishing).....................$ 14.88 4.32
----------------------------------------------------------------
PLUM0060-007 06/01/2004

JEFFERSON, ORLEANS, PLAQUEMINES, ST. BERNARD, ST. CHARLES, ST.
JAMES (Southeastern Portion), ST. JOHN THE BAPTIST, AND ST.
TAMMANY PARISHES:

Rates Fringes

Pipefitter (excludes HVAC).....$ 21.55 5.70
Plumber (includes HVAC pipe
and installation of system)....$ 21.55 5.70
----------------------------------------------------------------
PLUM0198-007 01/01/2005

ST. JAMES PARISH (Northwestern Portion):

Rates Fringes

Pipefitter (excludes HVAC).....$ 18.54 6.98
Plumber (includes HVAC pipe
and installation of system)....$ 18.54 6.98
----------------------------------------------------------------
SFLA0669-003 01/01/2005

Rates Fringes

Sprinkler Fitter...............$ 22.87 9.00
----------------------------------------------------------------
SULA2004-003 03/25/2004

Rates Fringes

Carpenter
Drywall & Metal Stud
Installation................$ 14.00 0.70
Formbuilding/Formsetting....$ 12.70 0.56
All Other Work..............$ 13.68 0.00
Cement Mason/Concrete Finisher.$ 12.28 0.00
Laborers:
Common......................$ 9.55 1.05
Mason Tender................$ 9.32 0.00
Power Equipment Operator
Backhoe/Excavator...........$ 14.00 0.42
Bulldozer...................$ 15.17 0.00
Crane.......................$ 14.00 1.80
Roofer (including Built Up,
Composition and Single Ply)
(includes metal roof)..........$ 12.28 0.00
Sheet Metal Worker (excluding
HVAC duct).....................$ 13.26 1.91
----------------------------------------------------------------

WELDERS - Receive rate prescribed for craft performing
operation to which welding is incidental.
================================================================

Unlisted classifications needed for work not included within
the scope of the classifications listed may be added after
award only as provided in the labor standards contract clauses
(29CFR 5.5 (a) (1) (ii)).

----------------------------------------------------------------

In the listing above, the "SU" designation means that rates
listed under the identifier do not reflect collectively
bargained wage and fringe benefit rates. Other designations
indicate unions whose rates have been determined to be
prevailing.

----------------------------------------------------------------

WAGE DETERMINATION APPEALS PROCESS

1.) Has there been an initial decision in the matter? This can
be:

* an existing published wage determination
* a survey underlying a wage determination
* a Wage and Hour Division letter setting forth a position on
a wage determination matter
* a conformance (additional classification and rate) ruling

On survey related matters, initial contact, including requests
for summaries of surveys, should be with the Wage and Hour
Regional Office for the area in which the survey was conducted
because those Regional Offices have responsibility for the
Davis-Bacon survey program. If the response from this initial
contact is not satisfactory, then the process described in 2.)
and 3.) should be followed.

With regard to any other matter not yet ripe for the formal
process described here, initial contact should be with the
Branch of Construction Wage Determinations. Write to:

Branch of Construction Wage Determinations
Wage and Hour Division
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210

2.) If the answer to the question in 1.) is yes, then an
interested party (those affected by the action) can request
review and reconsideration from the Wage and Hour Administrator
(See 29 CFR Part 1.8 and 29 CFR Part 7). Write to:

Wage and Hour Administrator
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210

The request should be accompanied by a full statement of the
interested party's position and by any information (wage
payment data, project description, area practice material,
etc.) that the requestor considers relevant to the issue.

3.) If the decision of the Administrator is not favorable, an
interested party may appeal directly to the Administrative
Review Board (formerly the Wage Appeals Board). Write to:

Administrative Review Board
U.S. Department of Labor
200 Constitution Avenue, N.W.
Washington, DC 20210

4.) All decisions by the Administrative Review Board are final.

================================================================

END OF GENERAL DECISION