We've detected that you're using an ad content blocking browser plug-in or feature. Ads provide a critical source of revenue to the continued operation of Silicon Investor.  We ask that you disable ad blocking while on Silicon Investor in the best interests of our community.  If you are not using an ad blocker but are still receiving this message, make sure your browser's tracking protection is set to the 'standard' level.
Gold/Mining/Energy : Gold and Silver Juniors, Mid-tiers and Producers -- Ignore unavailable to you. Want to Upgrade?


To: Mr. Aloha who wrote (8647)3/30/2006 3:30:21 PM
From: jackjc  Respond to of 78416
 
<Not many moly producers you can get this cheap>

Yes the CNQ listing and lack of promotion while they upgraded
their mill adding floatation for the moly production has left
them on the bargain counter IMO.

As soon as the ice clears they will be working on blasting
and trucking the moly ore to the mill for processing.

They have the right people working on the listing upgrade, with
a high priority.

I think when the first 3000T are processed the cash flow will
be a pleasant surprise, as moly prices have been holding up very well.



To: Mr. Aloha who wrote (8647)3/30/2006 3:42:53 PM
From: E. Charters  Read Replies (2) | Respond to of 78416
 
Assuming they can mint say 11 lbs of smelted metal from each ton, (conservative estimate) then given a 90,000 ton per year output, they have pretty fair ratios to talk about. This is a realistic scenario. Realistically too, they need the 3 to 4 million up front to start in on it. Capital up front is the name of the game.

What the bulk sample should demonstrate is what the return on mining per ton actually is. Since the samples run from 0.05 to 30% MoS2 (.025 to 15% recovered metal in oxide) it is dangerous to imagine averages at present.

If recovered grade comes out as good as 2% MoS2 then they can say they recover 20 lbs at the smelter just about for sure. In that case, you can look at perhaps 1.8 million lbs of moly metal pay in one year. That could materialize on the books by the end of 2007, assuming the price holds. Cost are in the region of 11.46 US dollars per lb with mining and milling combined with the smelter charges. Mining and milling costs may be about 7 dollars CDN per pure metal lb CDN. (6.03 US) (perhaps as low as 5.50/lb CDN or 4.75 US) Smelter charges are sliding scale, so profits are possible down to as low as 9-10 dollars US quoted for pure metal in oxide produced at the smelter.

EBIDT from the greater figures above could be as good as $28,260,000-$31,860,00 CDN by end of 2007. This figures exceeds their current capitalization by almost a factor of 2.

It is possible to mine profitably even if their metal recovery per ton is half the work up above. At $26 million recovered gross, they still make pretty fair money ... almost $13 million.

We may be able to add to that ourselves.

EC<:-}



To: Mr. Aloha who wrote (8647)3/30/2006 4:48:56 PM
From: LoneClone  Read Replies (1) | Respond to of 78416
 
Actually, that's another similarity to GPXM, who are going to use the seed money from moly production at Ashdown to get a gold circuit running there as well plus gold production at their Mineral Ridge property.

LC