We've detected that you're using an ad content blocking browser plug-in or feature. Ads provide a critical source of revenue to the continued operation of Silicon Investor.  We ask that you disable ad blocking while on Silicon Investor in the best interests of our community.  If you are not using an ad blocker but are still receiving this message, make sure your browser's tracking protection is set to the 'standard' level.
Gold/Mining/Energy : Century Mining Corporation -- Ignore unavailable to you. Want to Upgrade?


To: John McCarthy who wrote (167)7/24/2006 7:54:11 PM
From: LoneClone  Respond to of 545
 
John, I can partially answer one or two of your cogent questions.

According to my CMM notes, they plan to have a 43-101 compliant resource estimate ready for San Juan by Q3 this year.

And yes, drilling is a key for any 43-101 compliant resource report. The results of drilling are the main input to these reports.

LC



To: John McCarthy who wrote (167)7/27/2006 3:46:00 AM
From: HotnSpicy  Read Replies (1) | Respond to of 545
 
John, San Juan is planned to be 43-101 compliant this year. The Germans are updating their 2002 study to comply with Canadian standards. Almost all the data is there, they just need to massage it around to comply. They may be forced to drill a few confirmation holes near existing drill holes to show their original drill data matches the new data.

GC is another kettle of fish. They will need to drill like crazy to prove up a potentially huge target like that to get a decent 43-101 report on it.

Reserves are usually categorized by the amount (density, or spacing of drill holes) of the drill data. Proven has very high confidence levels due to extensive drilling data. Inferred may have a few holes that define a potential deposit, but not enough to provide confidence that all the material is economic.

There is good news with Santa Clarita and Erika. CMM was able to buy 43-101 compliant documents on those two prospects from the major who was interested in San Juan (I think it was Teck Comminco).

I don't have any idea of drill costs in Peru. I used to have a "rule of thumb cost" rolling around in my head, but I've plumb forgot.