To: LoneClone who wrote (17548 ) 4/10/2008 9:27:02 PM From: LoneClone Read Replies (1) | Respond to of 194002 Pure Nickel Announces Initial Results From Its William Lake Drill Program Thu Apr 10, 3:11 PMca.news.finance.yahoo.com TORONTO, ONTARIO--(Marketwire - April 10, 2008) - Pure Nickel Inc. (TSX: NIC.TO)(OTCBB: PNCKF.OB) is pleased to provide an update on results from the first 7 holes of its winter drill program at its William Lake Property located in the southern portion of the Thompson Nickel Belt, Central Manitoba. The property is owned 100% by Pure Nickel Inc. This winter the program encompassed an integrated exploration project that included diamond drilling and an 1159km VTEM airborne geophysical survey that identified numerous weak to highly conductive zones some of which were drilled. The surface drill program was completed on April 8th with a total of 7525.59 meters in 15 holes completed on budget. The drilling was completed on five zones within the 15 km William Lake trend. This winters program was testing nickel bearing horizons identified by the historical drilling (see 43-101 William Lake Technical Report). In view of the previous wide spaced drilling (up to 250 meters apart) one of the main objectives of the program was to establish the continuity of the known mineralization to provide confidence to work towards a mineral estimation for a 43-101 compliant resource on one or more sections. Testing for the continuity of mineralization included drilling above, below and on strike of the known zones at 50 to 100 m step outs. In addition, new zones identified by the VTEM survey, as well as previously identified nickel bearing horizons with little previous drilling and/or poor understanding of the mineralization, were also explored. This release details the assay results from the first 7 holes with an additional 8 holes to follow. Drilling results to date indicate significant nickel mineralization is found in 2 of the 3 zones targeted with results pending on an additional 3 zones. Highlights of the initial results include: - Hole 350 returned 5.15 m of 0.84% Ni, including 1.3 m of 2.11% Ni - Hole 351 returned 0.5 m of 1.11% Ni - Hole 354 returned 17.16 m of 0.51% Ni, 5.65 m of 1.02% Ni - Hole 355 returned 25.37 m of 0.44% Ni, 2.74 m of 1.68%, 1 m of 3.43% Ni - Hole 357 returned 9.1 m of 0.89% Ni, including a 3 m section of 1.0% Ni This program has demonstrated that the William Lake trend is a prolific nickel bearing property with continuity of mineralization. Additional assay results are pending on 8 holes including 2 holes in one zone that intersected greater than 20 metres of massive sulphides in each. The 2 holes are 75 meters apart in a zone that has historically reported results (see 43-101 William Lake Technical Report) ranging from 1.44% Ni over 0.57 meters to 3.44% Ni over 2.10 meters. These are the thickest massive sulphide intersections encountered in the 2007-08 drill program and assay results are pending. Additional analyses are to include PGE (platinum group elements) analyses on existing analyzed samples that return greater than 0.5% Ni or Cu because historical analyses on the William Lake trend returned 9.3g/t Pt, 11.0g/t Pd, 2.1g/t Rh, 2.9g/t Ir and 10.4 g/t Ru (U of T results 43-101 William Lake Technical Report) from a composite sample from one of the zones. Detailed drill results on the first 7 holes are tabulated below. Intersection length provided is meterage measured down hole. Core Core Drill Hole From To Length Length Nickel (meters) (meters) (meters) (feet) % WL08-PNI-350 543.95 546.37 2.42 7.94 0.55 and 550.37 552.94 2.57 8.43 0.64 and 600.70 605.85 5.15 16.90 0.84 Incl. 604.55 605.85 1.3 4.27 2.11 and 611.85 615.35 3.5 11.48 0.50 WL08-PNI-351 347.34 347.84 0.5 1.64 1.11 WL08-PNI-352 No significant values WL08-PNI-353 Drill hole did not reach target WL08-PNI-354 459.29 471.29 12 39.37 0.32 and 542.71 561.67 18.86 61.88 0.38 Incl. 542.71 551.97 9.28 30.45 0.47 and 569.82 583.82 14 45.93 0.50 Incl. 569.82 573.82 4 13.12 0.79 and 592.60 596.19 3.59 11.78 0.65 and 605.04 608.35 3.31 10.86 0.66 and 619.06 636.22 17.16 56.30 0.51 Incl. 631.06 636.22 5.16 16.93 0.70 and 651.36 662.42 11.06 36.29 0.57 and 659.36 662.42 3.06 10.04 0.93 and 705.85 713.50 7.65 25.10 0.89 Incl. 707.85 713.50 5.65 18.54 1.02 WL08-PNI-355 387.00 391.00 4 13.12 0.85 and 413.00 417.00 4 13.12 0.63 and 439.65 443.00 3.35 10.99 0.62 and 441.00 466.37 25.37 83.23 0.44 Incl. 457.00 459.00 2 6.56 1.00 and 490.00 495.64 5.64 18.50 0.74 and 594.86 597.60 2.74 8.99 1.68 Incl. 594.86 595.86 1 3.28 3.43 and 599.31 599.81 0.5 1.64 1.18 WL08-PNI-357 391.48 400.58 9.1 29.86 0.89 Incl. 395.58 398.58 3 9.84 1.00 and 477.75 481.75 4 13.12 0.53 Drill hole location map from the program can be found at the company's website: www.purenickel.com Quality Control: Aurora Geosciences Ltd. of Yellowknife is the project operator for Pure Nickel. Drill core is logged on site by Aurora's geologist. Core is then cut, one half is retained and stored on site for reference, and one half is sent for analysis. QA/QC programs employ the insertion of blanks and CANMET certified reference material at regular intervals as quality control. Additional standards, blanks and duplicate analyses are also employed by the analytical laboratory. Core samples are delivered to TSL Laboratories Inc. preparation facility in Saskatoon for crushing and pulverizing. Pulps are geochemically analyzed for nickel, copper, cobalt and sulphur and samples containing over 0.50% copper or nickel are reanalyzed with an assay technique using an aqua regia digestion for both methods. The aqua regia technique generally determines only the soluble sulphide nickel that is present and does not determine the amount of silicate nickel that may be present. Phillip Mudry, P.Geol. is Chief Exploration Consultant for Pure Nickel Inc. and is the designated Qualified Person (Q.P.) for the William Lake Project. Mr. Mudry is supervising drill hole planning, implementation and quality control/quality assurance programs at the William Lake project for 2008. About William Lake: William Lake is one of the principal properties acquired in the Xstrata Canadian Property purchase by Pure Nickel in July, 2007. Since the acquisition, the Pure Nickel exploration team has compiled a considerable amount of historical drill and geophysical data, commissioned the 43-101 Technical Report and commenced drilling on high priority target areas of know mineralization from the extensive dataset provided by Xstrata Nickel. The areas of known mineralization on the William Lake property evidenced by historic drill data extends over a distance of 15 kilometers. William Lake is close to metallurgical processing facilities at Thompson and Flin Flon, Manitoba, is well located adjacent to the major North South all weather highway and is bordered to the east by major regional electrical transmission power lines. About Pure Nickel Inc.: Pure Nickel is a mineral exploration company with a diverse collection of advanced nickel sulphide and PGE projects in Canada and Alaska. The Company's 2008 exploration program is underway on multiple properties and is fully funded. Some of the statements contained herein may be forward-looking statements which involve known and unknown risks and uncertainties. Without limitation, statements regarding potential mineralization and resources, exploration results, and future plans and objectives of the Company are forward looking statements that involve various risks. The following are important factors that could cause the Company's actual results to differ materially from those expressed or implied by such forward looking statements: changes in the world wide price of mineral commodities, general market conditions, risks inherent in mineral exploration, risks associated with development, construction and mining operations, the uncertainty of future profitability and the uncertainty of access to additional capital. There can be no assurance that forward-looking statements will prove to be accurate as actual results and future events may differ materially from those anticipated in such statements. Pure Nickel undertakes no obligation to update such forward-looking statements if circumstances or management's estimates or opinions should change. The reader is cautioned not to place undue reliance on such forward-looking statements. Total Shares Outstanding: 67.766 million Fully Diluted: 92.410 million 52-Week Trading Range: C$0.23 - $1.65 The TSX Exchange has not reviewed and does not accept responsibility for the adequacy or accuracy of this release. Contacts Jeff Walker The Howard Group Toll Free: 1-888-221-0915 Email: info@howardgroupinc.com Website: www.howardgroupinc.com David McPherson Pure Nickel Inc. President & CEO (416) 644-0066 (416) 644-0069 (FAX) Email: info@purenickel.com Website: www.purenickel.com