SI
SI
discoversearch

We've detected that you're using an ad content blocking browser plug-in or feature. Ads provide a critical source of revenue to the continued operation of Silicon Investor.  We ask that you disable ad blocking while on Silicon Investor in the best interests of our community.  If you are not using an ad blocker but are still receiving this message, make sure your browser's tracking protection is set to the 'standard' level.
Technology Stocks : Cisco Systems, Inc. - Off-topic postings -- Ignore unavailable to you. Want to Upgrade?


To: Lynn who wrote (149)5/1/2008 7:59:01 PM
From: Eric  Read Replies (1) | Respond to of 230
 
Boeing begins final assembly of fifth Dreamliner

By Seattle Times staff

Boeing has begun final assembly in Everett of the fifth 787 Dreamliner, which will be the third flight-test airplane.

Two ground-test airplanes that will never fly are also under assembly. The static test airframe moved from the assembly line April 25 into a test rig in another assembly bay, allowing the planes behind it — the fatigue test airplane and the second flight-test airplane — to move forward one position.

After assembly is complete, the fifth 787 will be fitted with an interior and become the first Dreamliner to be configured much as the jet will look like upon delivery to airlines.

Meanwhile, Boeing said, Dreamliner number 1 is on track to have its electrical systems turned on in June, with an expected first flight around October.

Boeing also said that Jack Jones, who formerly directed pre-flight operations and delivery of all airplanes rolled out in Everett, is now vice president in charge of 787 Final Assembly, replacing Steve Westby, who retired from Boeing Wednesday after a 31-year career.

seattletimes.nwsource.com