We've detected that you're using an ad content blocking browser plug-in or feature. Ads provide a critical source of revenue to the continued operation of Silicon Investor.  We ask that you disable ad blocking while on Silicon Investor in the best interests of our community.  If you are not using an ad blocker but are still receiving this message, make sure your browser's tracking protection is set to the 'standard' level.
Gold/Mining/Energy : Big Dog's Boom Boom Room -- Ignore unavailable to you. Want to Upgrade?


To: Schnullie who wrote (104145)6/30/2008 10:08:41 PM
From: Aggie  Respond to of 206334
 
The BOP (Blow Out Preventer) is a combination of ram-type and annular (bag-type) preventer elements. The ram type has been dressed with 4-1/2" elements, the presumption is, they are drilling with 4-1/2" drillpipe - a common size. They probably drilled an 8-1/2" hole for their 7". The annular type element can close on any size within its range. The rated working pressure for the BOP is 5000 psi, as stated.

After a casing or liner run, the BOP configuration is usually stated in the drilling reports just in case a well control incident is encountered, to facilitate cleaning up the mess. As per the regulations, they tested the BOP stack to both low and high pressures to prove it works. 250 and 3000 psi. The 3000 psi would be slightly in excess of what they expect formation pressure to be, or if calculated rigourously, the maximum anticipated surface pressure - MASP (my guess).

The 7" casing was run in and cemented with 400 sacks of cement - about 84 bbl of slurry if they blended it "neat" and (I'm guessing here) probably just enough to cement the casing and cover a little ways above the pay zone. They're on a budget - and waiting on the workover rig to complete the well.

Regards to all,

Aggie



To: Schnullie who wrote (104145)7/1/2008 10:08:17 AM
From: kollmhn  Respond to of 206334
 
Schnullie-

Thanks for the explanation of the abbreviated terms.

Fascinating stuff.