SI
SI
discoversearch

We've detected that you're using an ad content blocking browser plug-in or feature. Ads provide a critical source of revenue to the continued operation of Silicon Investor.  We ask that you disable ad blocking while on Silicon Investor in the best interests of our community.  If you are not using an ad blocker but are still receiving this message, make sure your browser's tracking protection is set to the 'standard' level.
Gold/Mining/Energy : Mining News of Note -- Ignore unavailable to you. Want to Upgrade?


To: LoneClone who wrote (27040)10/8/2008 12:45:00 PM
From: LoneClone  Read Replies (1) | Respond to of 193970
 
Oroco Intersects 18.50 g/t of Gold Over 2.0 Meters
Wed Oct 8, 9:10 AM

ca.news.finance.yahoo.com

VANCOUVER, BRITISH COLUMBIA--(Marketwire - Oct. 8, 2008) - Oroco Resource Corp. ("Oroco" or the "Company") (TSX VENTURE: OCO.V) is pleased to announce the results from an additional seven diamond drill holes at its 100% owned Cerro Prieto Property in Sonora State, Mexico.

Highlights of the current results include:

1. A total of 22 drill holes have been completed and all have intersected the mineralized shear zone;

2. CP013 intersected 23.1 meters (10.7 meters true thickness) averaging 0.95 g/t Au, 9.7 g/t Ag, 0.62% Pb and 1.58% Zn included within a 73.6 meter section (34.0 meters true thickness) averaging 0.40 g/t Au, 4.8 g/t Ag, 0.35% Pb and 1.23% Zn;

3. CP014 intersected 2.0 meters (1 meter true thickness) averaging 18.50 g/t Au, 85.7 g/t Ag, 0.31% Pb and 1.65% Zn included within a 64.0 meter section (31.0 meters true thickness) averaging 1.01 g/t Au, 13.7 g/t Ag, 0.16% Pb and 0.52% Zn;

4. CP015 intersected 4.0 meters (2.5 meters true thickness) averaging 0.72 g/t Au, 55.2 g/t Ag, 0.17% Cu, 2.94% Pb and 7.94% Zn included within a 22.0 meter section (13.5 meters true thickness) averaging 0.36 g/t Au, 15.9 g/t Ag, 0.87% Pb and 2.27% Zn;

5. CP018 intersected CP018 intersected 176.5 meters (65.4 meters true thickness) averaging 0.12 g/t Au, 4.1 g/t Ag, 0.30% Pb and 0.93% Zn.

The 22 holes drilled to date (5800 meters in total) are spaced horizontally and vertically at 100 meter intervals and have traced the mineralized shear zone over a strike length of 600 meters to a depth of 400 meters below surface. The holes reported in this release are at the southern end of the known mineralized shear zone where, historically, grades have been lower than to the north.

The last hole in the Phase 1 program has just been completed and is located 325 meters along strike to the north under the previously reported (see press release dated September 9, 2008) trench which assayed 79.7 g/t Ag, 0.401 g/t Au, 0.32% Pb and 0.47% Zn over a 36.3 meter section.

Trenching is continuing along the strike length of the mineralized zone on surface. All assays should be received by the end of October at which time the company will formulate its plans for a Phase 2 drill program.

--------------------------------------------------------------------------
FROM TO AT(i) TT(ii) Au Ag Cu Pb Zn
HOLE (m) (m) (m) (m) (g/t) (g/t) (%) (%) (%)
--------------------------------------------------------------------------
CP012 40.0 59.0 19.0 12.0 0.46 2.7 0.07 0.21
--------------------------------------------------------------------------
incl 57.1 59.0 1.9 1.2 4.16 6.2 0.08 0.27
--------------------------------------------------------------------------
59.0 STOPE
--------------------------------------------------------------------------
CP013 51.5 125.1 73.6 34.0 0.40 4.8 0.35 1.23
--------------------------------------------------------------------------
incl 69.5 77.0 7.5 3.5 0.14 4.9 0.33 2.89
--------------------------------------------------------------------------
and 102.0 125.1 23.1 10.7 0.95 9.7 0.62 1.58
--------------------------------------------------------------------------
CP014 21.4 85.4 64.0 31.0 1.01 13.7 0.16 0.52
--------------------------------------------------------------------------
incl 73.2 85.4 12.2 5.9 4.53 22.3 0.23 0.90
--------------------------------------------------------------------------
incl 74.3 76.3 2.0 1.0 18.50 85.7 0.31 1.65
--------------------------------------------------------------------------
CP015 200.0 222.0 22.0 13.5 0.36 15.9 0.05 0.87 2.27
--------------------------------------------------------------------------
incl 206.5 210.5 4.0 2.5 0.72 55.2 0.17 2.94 7.94
--------------------------------------------------------------------------
CP016 188.0 246.0 58.0 37.8 0.21 4.1 0.49 1.54
--------------------------------------------------------------------------
incl 222.0 229.5 7.5 4.9 0.37 11.3 0.01 1.11 3.33
--------------------------------------------------------------------------
CP017 135.5 230.0 94.5 54.0 0.132 2.2 0.02 0.26 0.90
--------------------------------------------------------------------------
incl 159.5 196.0 36.5 20.9 0.11 2.3 0.03 0.28 1.05
--------------------------------------------------------------------------
incl 192.0 196.0 4.0 2.3 0.17 1.0 0.20 0.71 1.35
--------------------------------------------------------------------------
CP018 197.5 374.0 176.5 65.4 0.12 4.1 0.30 0.93
--------------------------------------------------------------------------
incl 197.5 253.0 55.0 20.4 0.13 1.3 0.01 0.31 0.74
--------------------------------------------------------------------------
incl 231.0 241.0 10.0 3.7 0.14 1.5 0.44 1.38
--------------------------------------------------------------------------
also 288.0 374.0 86.0 31.9 0.12 3.0 0.02 0.37 1.24
--------------------------------------------------------------------------
incl 331.0 361.0 30.0 11.1 0.12 4.6 0.01 0.34 1.85
--------------------------------------------------------------------------

(i) AT means apparent thickness

(ii) TT means true thickness


The Cerro Prieto polymetallic project is located in Sonora State, Mexico and consists of three mineral concessions totaling 2,523 hectares. Oroco holds a 100% interest in these concessions. In April of this year a Phase 1 drill program commenced and, at the completion of this 23 hole program the mineralized zone will have been drill tested vertically at 100 meter centers along a strike length of at least 600 meters to a depth of 400 meters allowing the calculation of an initial estimation of resources.

The company is excited about the extent and consistency of the mineralization along the strike length and to depth, and with the potential to expand the zone in all directions.

Qualified Person

Kenneth R. Thorsen, B.Sc., P. Geo., is a director of the company and is a 'qualified person' for the purposes of National Instrument 43-101 Standards of Disclosure for Mineral Properties of the Canadian Securities Administrators and has verified the data (including sampling, analytical and test data) and prepared or supervised the preparation of the information contained in this news release.

Quality Assurance & Control

The Company has implemented a quality assurance and control (QA/QC) program to ensure sampling and analysis of all exploration work is conducted in accordance with the best possible practices. Split core is transported to the ALS Chemex laboratory in Hermosillo where it is crushed and pulverized, with pulps sent to the ALS Chemex laboratory in Vancouver, B.C. for assaying. The other half of the core is retained for future assay verification. The QA/QC policy includes the chain of custody monitoring, insertion of blanks, standards and duplicates in the initial samples submitted. The laboratory provides an additional internal control program.

Stephen Leahy, President

The TSX Venture Exchange has not reviewed and does not accept responsibility for the adequacy or accuracy of the contents of this news release.

Contacts

Stephen Leahy
Oroco Resource Corp.
President
(604) 688-6200
(604) 688-6260 (FAX)
Website: www.orocoresourcecorp.com