SI
SI
discoversearch

We've detected that you're using an ad content blocking browser plug-in or feature. Ads provide a critical source of revenue to the continued operation of Silicon Investor.  We ask that you disable ad blocking while on Silicon Investor in the best interests of our community.  If you are not using an ad blocker but are still receiving this message, make sure your browser's tracking protection is set to the 'standard' level.
Politics : Rat's Nest - Chronicles of Collapse -- Ignore unavailable to you. Want to Upgrade?


To: Wharf Rat who wrote (10707)6/1/2010 9:46:21 AM
From: Wharf Rat  Respond to of 24235
 
The BP Deepwater Oil Spill - Cutting Metal Under Water and Tuesday Open Thread 1
Posted by Heading Out on June 1, 2010 - 8:30am

The decision to cut the riser and drill pipe (DP) from the top of the Blow-Out Preventer (BOP) as a first step in putting the Lower Marine Riser Package (LMRP) over the leaking oil well in the Gulf of Mexico is not quite as easy as it might sound to a layman. This post is going to talk a little about a couple of the problems, as well as an alternate way of doing it, and should end with a possibly slightly amusing anecdote.

The current plan is to carry out the operation in two parts, first the main body of the riser and contained DP will be cut using a large shearing machine, and then a precision cut will be made with a diamond wire cutter to prepare the surface to act as a support and seal for the LMRP. (Illustrations are below the fold). There are a couple of reasons why this is going to be done this way, and one or two concerns that will need to be watched as the operation continues.

(To learn more about the technical basics of LMRP, please go to this post: theoildrum.com
theoildrum.com