SI
SI
discoversearch

We've detected that you're using an ad content blocking browser plug-in or feature. Ads provide a critical source of revenue to the continued operation of Silicon Investor.  We ask that you disable ad blocking while on Silicon Investor in the best interests of our community.  If you are not using an ad blocker but are still receiving this message, make sure your browser's tracking protection is set to the 'standard' level.
Strategies & Market Trends : The Residential Real Estate Post-Crash Index-Moderated -- Ignore unavailable to you. Want to Upgrade?


To: yard_man who wrote (12289)3/16/2011 10:06:21 PM
From: neolib1 Recommendation  Read Replies (2) | Respond to of 119360
 
Yeah, you know so much, that last week you would have claimed these plants were perfectly safe??



To: yard_man who wrote (12289)3/16/2011 10:12:17 PM
From: Broken_Clock2 Recommendations  Read Replies (1) | Respond to of 119360
 
Japan reactor design caused GE engineer to quit

– Tue Mar 15, 7:07 pm ET
NEW YORK (Reuters) – A General Electric Co engineer said he resigned 35 years ago over concern about the safety of a nuclear reactor design used in the now crippled Fukushima Daiichi plant in Japan.
Dale Bridenbaugh said the "Mark 1" design had "not yet been designed to withstand the loads" that could be experienced in a large-scale accident.
"At the time, I didn't think the utilities were taking things seriously enough," Bridenbaugh, now retired, said in a phone interview. "I felt some of the plants should have been shut down while the analysis was completed, and GE and the utilities didn't want to do that, so I left."
Bridenbaugh said that to the best of his knowledge, the design flaws he had identified were addressed at the Daiichi plant, requiring "a fairly significant expense."
The Aptos, California, resident spoke earlier with ABC News, a unit of Walt Disney Co.
GE in a statement said it has had "40 years of safe operations" of its boiling water reactor Mark 1 technology.
"In 1980 the (Nuclear Regulatory Commission) issued a generic industry order assessing the Mark 1 containment," the Fairfield, Connecticut-based company added. "We responded to this order and issued it to all of our customers."
Following last Friday's 9.0 earthquake and tsunami, the Daiichi plant has suffered several explosions, and is now sending radiation wafting into Tokyo, 150 miles to the south. Authorities are trying to prevent a full meltdown.
Bridenbaugh said that after leaving GE he started a firm to advise state governments on safety issues. Like many, he said he is watching closely as events unfold in Japan.
"I feel sorry for the guys over there trying to handle that thing," he said. "On the other hand you can't say the Fukushima situation is a direct result of the Mark 1 containment. It is a direct result of the earthquake, tsunami and the fact the Mark 1 containment is less forgiving than some of the other reactor versions."