SI
SI
discoversearch

We've detected that you're using an ad content blocking browser plug-in or feature. Ads provide a critical source of revenue to the continued operation of Silicon Investor.  We ask that you disable ad blocking while on Silicon Investor in the best interests of our community.  If you are not using an ad blocker but are still receiving this message, make sure your browser's tracking protection is set to the 'standard' level.
Pastimes : Plastics to Oil - Pyrolysis and Secret Catalysts and Alterna -- Ignore unavailable to you. Want to Upgrade?


To: Steady_on who wrote (8924)7/11/2011 1:16:58 PM
From: SteveFRead Replies (1) | Respond to of 53574
 
The portion of the system that DEC is concerned with is the heater and it's output. That portion of the system hasn't been changed, so I doubt that DEC is concerned.

That isn't believable.

"Additional testing using approved EPA methods will be required at the maximum nominal operating rate of 2000 lbs/hour (within 10% of 100% peak load) using typical procured feedstock material. Testing must be completed within 60 days after maximum production in a single unit is achieved but not later than 180 days after date of permit issuance. A written protocol must be submitted a minimum of 30 days prior to the scheduled test date and must be approved by the Department prior to commencement of testing. Written results must be submitted to the Department within 60 days after completion of testing. If all three rotary kiln process units are designed, constructed, and operated in an identical manner, only one unit needs to be tested to represent a typical process. If there is significant variability between the units in as-built construction or in operating parameters, more than one unit may need to be tested."

sec.gov



To: Steady_on who wrote (8924)7/11/2011 1:26:28 PM
From: SteveFRespond to of 53574
 
Isn't it far more likely that instead of an IT guy with no background in any of this inventing all of these random technologies that that guy simply discovered Donghe China and didn't think his marks would figure it out?



To: Steady_on who wrote (8924)2/28/2012 4:00:14 PM
From: SteveFRespond to of 53574
 
The P2O system is a closed loop system. The portion of the system that DEC is concerned with is the heater and it's output. That portion of the system hasn't been changed, so I doubt that DEC is concerned.

Still don't feel mislead?



To: Steady_on who wrote (8924)2/28/2012 4:22:52 PM
From: YAWNRead Replies (2) | Respond to of 53574
 
"closed loop system" The cooling system in your car is closed loop. Nothing enters or exits except heat.

You have plastic in, oil out. This is not closed loop.

Premelt? gas in, exhaust out. not closed loop.

What part of it is closed loop?