We've detected that you're using an ad content blocking browser plug-in or feature. Ads provide a critical source of revenue to the continued operation of Silicon Investor.  We ask that you disable ad blocking while on Silicon Investor in the best interests of our community.  If you are not using an ad blocker but are still receiving this message, make sure your browser's tracking protection is set to the 'standard' level.
Pastimes : Plastics to Oil - Pyrolysis and Secret Catalysts and Alterna -- Ignore unavailable to you. Want to Upgrade?


To: SteveF who wrote (18544)2/8/2012 2:42:16 PM
From: Steady_onRead Replies (1) | Respond to of 53574
 
It wasn't the permit application that DEC took issue with but certain aspects of the design.

The design drawings were submitted to DEC for inspection. DEC didn't like some things and suggested other ways to accomplish the same task. There was a back and forth discussion on those items that ultimately resulted in design changes that were acceptable to both JBI and the DEC.

The willingness of JBI to listen to DEC and work with the DEC to arrive at mutually acceptable changes is a big reason that DEC said it had a good working relationship with JBI.