To: Goose94 who wrote (1995 ) 9/1/2013 5:30:44 PM From: Goose94 Read Replies (2) | Respond to of 202735 Gold Standard Ventures (GSV-V) resumes drilling at Railroad Aug 13, 2013 - News Release Gold Standard Ventures Corp. has restarted the Railroad project drilling program. A budget of $3-million has been approved by the Gold Standard board of directors to drill approximately 9,000 metres in about 16 RC (reverse circulation) and/or core holes to test several of the most promising targets on the Railroad project. This program will initially focus on extension of the high-grade gold mineralization encountered in the lower breccia within hole RR13-08 (73.5 m of 3.67 grams per tonne gold (g/t Au)) in the North Bullion deposit. This lower breccia, which comprises dominantly collapsed breccia, is the preferred depositional environment for gold and the intercept in 13-08 is essentially open in all directions. Gold mineralization in the collapse breccias tends to be more laterally extensive and uniformly distributed. Previous holes drilled into this breccia encountered equally thick, 50 to 100 m intervals of consistent 0.5 to two g/t Au mineralization. Hole RR13-11 is in progress to provide a test of this prospective high-grade zone to the west of the RR13-08 intercept. Based on the results of both RR13-08 and RR13-11, an offset hole to the north will immediately follow. Major emphasis is also being placed upon drill testing target opportunities south of the North Bullion deposit along the Bullion fault corridor (BFC). Surface geochemical work conducted over the past several weeks, while drilling was suspended, has served to further define a number of promising drill targets. The southern portion of the BFC target area and the other nearby target opportunities were previously inaccessible for drill testing because of permitting constraints. An exploration plan of operations (POO) was finalized and approved by the Bureau of Land Management (BLM) in December, 2012; this plan provides full access to all the targets in the northern third of the property. The BFC is the same structural zone that controls the North Bullion deposit. Targets along the corridor are developed from surface mapping, geochemical sampling, CSAMT and gravity data. CSAMT data indicate the presence of both a northward and southward continuation of target opportunities. The North Bullion deposit was essentially a blind discovery with no surface indication. The deposit is now effectively characterized by CSAMT data. The data show intermediate resistivity representing a wedge of mixed clastic and carbonate material between the in-place, rooted Paleozoic carbonate and clastic rocks and the flanking, down-dropped volcanic rocks to the east. This is a signature which is now being pursued. The CSAMT data modelled from the North Bullion deposit indicate the presence of similar wedges along a strike length of about six kilometres to the south. No previous drilling has tested these target zones. Prospective drill sites are currently being designed based on a comprehensive integration and evaluation of all the data. Four additional important targets to be tested in this 2013 program are: The Railroad fault zone is a west-northwest-striking corridor of structure, mineralization and dikes analogous to the gold-mineralized Rain fault in the Rain mining district about five miles to the north. Vertical RC hole RRF13-1 is currently in progress. The copper-gold target is indicated by several shallow, historic holes that encountered 40-to-120-plus-metre-thick intervals of 0.25 to 1.0 per cent copper with gold and/or silver mineralization. Some of these holes bottomed in copper and gold mineralization. Vertical core hole RRB13-1 is in progress on this target. The Central Bullion target is an offset of hole RRB12-3 that intersected two thick zones of mineralization of 76.2 m of 0.25 per cent Cu with 44.6 g/t Ag (1.3 ounces per ton silver), and 57 m of 0.78 per cent Cu with 58.3 g/t Ag (1.7 ounces per ton silver). This hole is sited and pending. A target referred at this time as Steve's Camp in the Central Bullion area is a large surface area of strongly anomalous base and precious metal gossan. This hole is sited and pending. Dave Mathewson, Gold Standard's vice-president of exploration, stated: "Our exploration effort is highly focused on discovery of gold as the presence of Carlin-type gold deposit potential is clearly established in the Railroad district. However, it is also apparent that we are also dealing with a very large and robust polymetallic porphyry copper-type metal system. In particular, copper and silver and gold have been encountered in thick intercepts typical of grades encountered in producing porphyry copper-type mines. The silver is of particular interest from the aspect that we have encountered up to very high-grade intervals (five feet of 60 ounces per ton silver and two feet of 240 ounces per ton silver in RR11-13), and locally very thick intervals of the metal in a number of drill holes within several targets, notably the Bullion fault structural corridor, Railroad fault corridor and of course in the historically mined Central Bullion area. We believe that discovery of significant bulk-minable copper with a strong precious metals credit can significantly enhance shareholder value. Some of our exploration effort will build on this opportunity." The scientific and technical content and interpretations contained in this news release have been reviewed, verified and approved by Steven R. Koehler, Gold Standard's manager of projects, BSc (geology), and CPG-10216, a qualified person as defined by NI 43-101, standards of disclosure for mineral projects. We seek Safe Harbor.