SI
SI
discoversearch

We've detected that you're using an ad content blocking browser plug-in or feature. Ads provide a critical source of revenue to the continued operation of Silicon Investor.  We ask that you disable ad blocking while on Silicon Investor in the best interests of our community.  If you are not using an ad blocker but are still receiving this message, make sure your browser's tracking protection is set to the 'standard' level.
Strategies & Market Trends : Dino's Bar & Grill -- Ignore unavailable to you. Want to Upgrade?


To: Andrew~ who wrote (5507)3/3/2014 3:09:41 PM
From: Andrew~Respond to of 202684
 
AGE-V matches it's 52-week high (0.25)



To: Andrew~ who wrote (5507)4/16/2014 8:39:17 AM
From: Andrew~Read Replies (1) | Respond to of 202684
 
AGE-V, GFK-V
GFK Resources and Adventure Gold -- Drilling Operations Update for the Casa-CAMERON Project, Quebec -- 3,000-METRE Phase 1 on Florence Property

GFK Resources Inc. (the "Company" or "GFK") - (TSX VENTURE: GFK) and Adventure Gold Inc.(TSX VENTURE: AGE) have provided an update on drilling operations at the Casa-Cameron project (the "Project") on Florence property (the "Property") in the northwest region of the province of Quebec.

Drilling at the Property began March 7, 2014 (see news release dated March 3, 2014). At this day, four (4) Diamond Drill Holes totalling 1,663 metres were completed (Figure 1). The drill rig is now on the target no-5, and 200 metres has been completed. The five (5) holes have tested the Chieftain gold deformation zone over a strike length of 1.5 km between the surface and around 275 metres deep. Historical drilling in this area returned up to 1 g/t Au over 26 metres, including 2.9 g/t Au over 3.9 metres and 1 g/t Au over 18.6 metres, including 2.8 g/t Au over 4.2 metres (holes CH-1 and G-91-7: GM55861). For now, a total of 649 drill samples (4 holes) have been submitted for assay. Once assay results have been returned to project operator Adventure Gold Inc., validated, compiled and provided to GFK, those assays will be released as soon as possible.

About the 2014 Exploration Program

The 2014 exploration diamond drilling program on the Casa-Cameron project will be conducted in three (3) phases totaling 9,000 metres of drilling, of which Phase 1, for 3,000 metres is underway on the Florence property. The Project includes nine (9) properties (the "Properties") strategically located along the prolific Casa-Berardi/Cameron Gold Trend, in the Abitibi Greenstone Belt, Quebec (Figure 2). Phase 2 and 3 drilling programs are slated to start respectively in May and September on other Properties of the Project.

stockboard.com